说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 单任务与双任务
1)  Single and dual tasks
单任务与双任务
2)  dual-task
双任务
1.
A child wrote a line under spontaneous and dual-task conditions, a digitizing tablet was used to record the handwriting movements′ velocity and acceleration.
选取小学生47名,其中23名为数学不良,24名为一般儿童,使用数码写字板,测试二者在自然和双任务条件下,书写一条横线的速度、加速度。
2.
The traditionally separate researches on cognition and posture have been connected in the study of posture-cognition dual-tasking, which has become a new expanding area of research.
姿势与认知的双任务研究将两个分离的主题联系起来,成为一个新的正在扩展的领域。
3)  dual-mission
双重任务
1.
It is necessary to clarify who were the leaders of the Alliance,what were its nature and mission and what were its dual-nature and dual-mission in order to have a full understanding of its history.
华北地区朝鲜革命青年建立的朝鲜独立同盟及朝鲜义勇军为中国抗战和朝鲜的独立而英勇奋战,要正确地理解它的历史,必须澄清朝鲜独立同盟的领导人、同盟的性质及任务、同盟的双重任务,同时还要认真区分在中国关内地区活动的两个朝鲜人的反日组织。
4)  Dual-Task Methodology
双任务法
5)  task unit
任务单元
6)  mono task
单任务
补充资料:工程任务单
      施工单位向工人班组下达综合施工计划的书面指令,也称施工任务书。工程任务单是落实全部施工计划和检查验收计划完成情况的手段之一,是考核班组全面工作和支付工资与奖金的原始凭证,是单位工程完工后费用结算的部分依据。工程任务单的主要内容有工程项目、工程数量、劳动定额工日数、完成期限以及材料限额、安全措施和技术质量等方面的计划要求(见建筑施工安全、施工质量管理),在施工过程中由班组按时填写实际完成进度、实际用工数、实际材料消耗。待任务完成后,由各业务人员填写各项指标完成情况作为统计和核算的依据,并加以评价,交给验收人员。
  
  工程任务单的下达,由基层施工单位的负责人组织有关业务人员根据施工总体计划、月作业计划、劳动定额、材料定额、质量标准分别按任务书中的项目填写清楚,并由基层施工单位的负责人交底下达。工程任务单的验收,由负责该项施工任务的工长根据施工单位对工程的总体要求进行验收并填写验收评价。经基层施工单位负责人批准后交有关部门进行结算。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条