说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 感控措施
1)  Infection control measure
感控措施
2)  Monitoring Measures
监控措施
1.
Research on Monitoring Measures of Safety and Environment of Electrical Laboratory;
电器实验室安全和环境监控措施探讨
3)  control measure
控制措施
1.
Reasons and control measures of the sputtering in CO_2 welding;
CO_2焊产生飞溅的原因及控制措施
2.
A preliminary discussion of several factors influencing shelf-life of UHT milk and corresponding control measures;
浅谈影响UHT奶货架期的各类因素及控制措施
3.
On the noise causes and control measures of rice milling machine;
碾米机噪声产生的原因与控制措施
4)  Control measures
控制措施
1.
Study on hazards of raw milk and control measures;
原料乳危害及控制措施研究
2.
Analysis on factors influenced to safety assessment quality and control measures;
影响安全评价质量的因素与控制措施分析
3.
Stability analysis and control measures of powered supports in greater inclined full-mechanized coal seam;
大倾角综放开采液压支架稳定性分析与控制措施
5)  control method
控制措施
1.
Browning of concentrated apple juice and its control methods;
浓缩苹果汁的褐变与控制措施
2.
The quality requirements for rails and control methods used in railway production of Baogang;
钢轨的质量要求与包钢钢轨生产的质量控制措施
3.
This paper introduces the studies of the lately years about nitrogen loses and the control method,and try to come out the causes of the lost,the factors involved and the control methods effect,furthermore,the control methods are summarized.
随着国内外对稻田氮素流失的研究日益深入,对稻田氮素流失及其控制措施的研究进行了分析和总结。
6)  pre-control measures
预控措施
1.
Application of dangerous location identification and pre-control measures in safety management of 750kV power transmission line construction
危险点辨识及预控措施在750kV送电线路施工安全管理中的应用
2.
The paper analyses the quality problem existing in bottling pile, and presents the effective pre-control measures, which can provide reference for similar works.
针对灌注桩可能出现的质量问题,提出有效地预控措施,可供同类工程借鉴。
3.
In this paper,combined with a number of projects,based on norms and standards,the second phase of the formation of cracks and their development process was descript and analyzed in detail,and the corresponding pre-control measures were put forward,which can provide a reference for similar projects and guidance.
现浇混凝土收缩裂缝的产生可分为三个阶段,本文结合多项工程实例,以相关规范和标准为依据,对其中的第二个阶段裂缝的形成及其发展过程做出了详细的描述与分析,并提出了相应的预控措施,可为类似工程提供参考和指导。
补充资料:不合格品纠正措施(见纠正措施)


不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions

bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条