说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 平衡木试验
1)  Beam balance test
平衡木试验
2)  balance test
平衡试验
3)  Beam Balance Test(BBT)
平衡木实验
4)  water balance test
水平衡试验
1.
In order to implement the water-saving plan established by the State Power Corporation for thermal power plants during the 10th five year plan,water balance tests were conducted at the thermal power plants in Heilongjiang province using the ultrasonic flowmetering together with volume and estimation methods.
为全面贯彻落实国家电力公司火力发电厂"十五"节水规划,通过利用以超声波流量计测量为主,结合容积法、测算法等方法,对黑龙江省的火电厂进行了水平衡试验,并对实际测试数据进行了分析。
5)  water balance experiment
水平衡试验
1.
Water-saving effect analysis before and after water balance experiment;
水平衡试验前后节水效果分析
6)  thermal balance test
热平衡试验
1.
Review on the thermal balance test for spacecraft;
航天器热平衡试验技术评述
2.
Temperature prediction and simulation model of satellite’s thermal balance test;
卫星热平衡试验的温度预测与仿真模型
3.
In this paper,a thermal balance test and the related measurement results for a 200Nms single-gimbal control momentum gyro have been introduced.
介绍了一种200Nms单框架控制力矩陀螺的热平衡试验及其试验结果。
补充资料:平衡木
平衡木
balance beam

   女子竞技体操项目。器械为一长500厘米、宽10厘米的木条,平置并固定于高120厘米的支架上。比赛成套动作包括各种跳步、转体、平衡、造型及各种翻滚动作,在规定的时间内完成。1936年第十一届奥运会列为女子团体比赛内容。作为单独比赛项目,1952年第十五届奥运会才正式确定下来。50年代初期,动作以走、跑、跳步和一些平衡、滚翻、倒立、舞蹈动作为主。50年代后期,软翻类动作移植到平衡木。60年代出现了快滚翻、单臂倒立、依次软翻、手翻和侧空翻、前空翻转体类型下法等动作。70年代,技术发展迅速,快速手翻、前空翻和后空翻被移植过来,使这项技术的发展进入新阶段。80年代以来,又出现了踺子后手翻后空翻站木,踺子拉拉提再接拉拉提  、空翻转体站木和空翻两周转体360°下法等动作及其连接。提高整套动作的艺术性、竞技性和稳定性是平衡木发展的趋势。
   
   

平衡木比赛

平衡木比赛

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条