1) Horsehead
马头门
1.
Horsehead Stability Analysis of Tingnan Mine's Auxiliary Shaft;
亭南矿副井马头门稳定性分析
2.
The connected rocks between-456 m level horsehead door and outlet shaft in Suntun Coal Mine,Huaibei Mining Group Co Ltd are mud rock and coal.
淮北矿业(集团)有限责任公司孙疃煤矿回风井井筒与-456 m水平马头门连接处岩层为泥岩和煤,2层煤位于马头门拱部和其顶板上1m位置,普通锚网喷达不到安全要求,故增加锚索和槽钢骨架支护。
3.
This paper analysed the mechanical properties of horsehead structure through the mumerical simulation.
本文通过数值模拟分析了马头门结构力学特性。
2) ingate
['inɡeit]
马头门
1.
Analysis on Destruction of Air Shaft Ingate in Liuzhuang Coal Mine;
刘庄矿风井马头门破坏的分析
2.
Study on Repair and control technology for failed ingate in deep soft rock of mine shaft
深部软岩井筒马头门破坏修复治理技术研究
3.
The general procedures for constructing subway are as follows: first excavate the shaft,then horizontal pass,finally ingate.
地铁施工中一般采取先竖井继而横通道后开马头门进行正线施工的施工工序。
3) ingate
['inɡeit]
马头门(能)
4) bottom and shaft joint of the auxiliary shafts
副井马头门
1.
The destruction causes of the bottom and shaft joint of the auxiliary shafts in Guhanshan coal mine and its repairing countermeasures;
古汉山煤矿副井马头门破坏原因及修复对策
5) mine ingate
立井马头门
补充资料:马头门
马头门
inset
motOU【1祀n马头门(i nset)竖井井筒与井底车场的联接处。形状似马头,是矿岩、设备、材料和人员的转运点。根据车场的通过能力,马头门分单面和双面两种形式,并均为斜顶式。马头门设有稳罐、推车和阻车设备以及信号房等.马头门高度一般为4 .5~sm,由下放材料的长度决定;宽度由运翰线路数、运翰设备最大宽度和人行道的宽度确定;斜顶段长度一般不小于sm.马头门应采用防火材料支护,如混凝土或钢筋混凝土。 (戚道贤)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条