1) transurethral electro-vaporization
电汽化切除
1.
Clinical significance of anaesthesia monitoring hemodynamics and blood biochemical indexes with perioperative transurethral electro-vaporization of prostate;
前列腺电汽化切除术中麻醉监测的临床意义
4) plasmakentic electrovaporization resection
等离子体电汽化切除术
1.
Transurethral plasmakentic electrovaporization resection of prostate for high risk patients with BPH;
经尿道等离子体电汽化切除术治疗高危型前列腺增生43例
5) electrovaporization-ablation prostatectomy
电汽化前列腺切除术
1.
This paper compared the efficacy and complication among transurethral contact laser prostatectomy (TULP), transurethral vaporization prostatectomy (TVP), and a new operative technique of transurethral electrovaporization-ablation prostatectomy (TUEVAP) in the treatment of men with symptomatic benign prostatic hyperplasia (BPH).
比较经尿道接触式激光前列腺切除术(TULP),经尿道电极汽化式前列腺切除术(TVP)和经尿道电汽化前列腺切除术(TUEVAP)对良性前列腺增生症(BPH)的治疗效果。
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条