1) Vestibular Aqueduct
前庭水管
1.
Clinical analysis of 10 patients with large vestibular aqueduct syndrome;
大前庭水管综合征临床特征分析(附10例报告)
2) vestibular aqueduct
前庭导水管
1.
Objective: To explore morphologic features of the vestibular aqueduct (VA)of normal adults.
目的:测量和了解在体前庭导水管(vestibularaqueduct,VA)CT解剖形态和正常大小。
2.
Objective The manifestions of large vestibular aqueduct on CT and MRI were analysed retrospectively,a comparsion between CT and MRI also made.
目的 本文回顾分析了 14例前庭导水管扩大患者的CT、MRI资料 ,并对两种检查方法作了比较。
3) large vestibular aqueduct
大前庭水管
1.
Objective:To know the rehabilitation for s ev ere to profound hearing loss of large vestibular aqueduct syndrome(LVAS) with co chlear implants.
目的 :了解人工耳蜗植入法康复大前庭水管综合征 (LVAS)重度和极重度听力损失的效果。
4) Vestibular aqueduct/pathology
前庭水管/病理学
5) Large vestibular agueduct
前庭导水管扩大
6) Enlarged vestibular aqueduct
前庭水管扩大
1.
Enlarged vestibular aqueduct(EVA) is the commest inner ear malformation, which acounts for about 1-12% in the children with sensorineural hearing loss.
前庭水管扩大(Enlarged Vestibular Aqueduct,EVA)是一种最常见的内耳畸形,其在感音神经性听力损失患者中约占1-12%。
补充资料:钢筋混凝土循环水管施工
钢筋混凝土循环水管施工
reinforced concrete circulating water pipe construction
gongjln hunn一ngtu xunhuanshu一guan sh一gong钢筋混凝i循环水管施工(reinforced con-erete eireulating water pipe eonstruetion)有现浇和预制两种施工方法。现浇管在挖沟完后,在沟内分段浇筑。预制预应力管在工厂制作,再运到现场敷设。预制管工厂的设备比较简单,如工程地点离工厂较远而该种管子数t多时可将设备搬到现场制造。管子的直径可达3m甚至更大,长度一般为4m。 预制预应力钢筋棍凝土管预制,可用一阶段(展动挤压)工艺或三阶段(管芯绕丝)工艺施工。一阶段工艺系用申立式成型,用加工精密的内外钢套模组合定型,将主钢筋张拉完成后,即浇筑混凝土一次成型,经静定时间后蒸汽养护.三阶段工艺系按上法先浇制混凝土管芯,成型后再在管芯上缠绕预应力钢丝,用机械或电热法张拉,然后再喷盖水泥砂浆保护层,以防钢丝生锈,经水压试验合格后出厂使用。 数设带承插口的钢筋混凝土预制管挖沟徽设.平口对接的钥筋混凝土预制管除挖沟徽设外,还可采用顶管施工(见取水构筑物施工)。挖沟后按设计规定在沟底铺一层黄沙或石子,再用起重机械将预制管逐节吊人沟内、找正位!,在插口上套上橡胶密封圈后,往前一节的承口方向水平加力拉紧,使插口和橡胶圈同时均匀地嵌人承插口内,按此步探依次进行下一节管的安装.橡胶圈本身的直径略大于承插口间尺寸,并有规定的压缩比及防老化剂。在承擂口内侧采用钢衬圈和密封环进行环向水压试验.水压试验的标准按设计和规范要求。安装后进行回坟土,要求在两侧均匀回填分层夯实。 预应力钢筋混凝土管自重较大,在软土地区使用时要做混凝土基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条