说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沃勒变性
1)  Wallerian degeneration
沃勒变性
2)  Wallerian degeneration
沃勒氏变性
3)  Waller ['wɔ:lə]
沃勒
1.
The Conflict between Individual s Instinctive Desire and Modern Civilization——On Waller s Rebellion against Modern Civilization;
本能欲望与现代文明的冲突——谈沃勒的反叛
4)  Wallerian degeneration
华勒变性
1.
Effect of astragalus polysaccharides on the cellular immune function in rats with sciatic nerve Wallerian degeneration;
黄芪多糖对坐骨神经华勒变性大鼠细胞免疫功能的作用研究
5)  wallerstein
沃勒斯坦
1.
Analyzing Wallerstein s Theory of Accumulation of the Capital;
沃勒斯坦的资本积累论评析
6)  Immanuel Wallerstein
沃勒斯坦
1.
Discussing the “World System Theory” of Immanuel Wallerstein;
评沃勒斯坦的“世界体系”论
2.
Immanuel Wallerstein,the founder of world-system theory,examines the origin,divergence and limits of traditional discipline specialization from the perspective of world-system,advances unidiscipline and constructing historical social science,which is important for reconstructing social science.
沃勒斯坦从世界体系的视野所提出的一体化学科和建构历史社会科学的主张,在理论上颇有“野心”,它不仅要整合社会科学,还要整合自然科学与人文学科。
补充资料:沃勒甘巴坝

沃勒甘巴坝

Warragamba Dam


概  述

  沃勒甘巴坝位于澳大利亚新南威尔士州大分水岭东部沃勒甘巴(Warragamba)河上,靠近悉尼市。工程主要是为悉尼市提供生活用水。大坝为混凝土重力坝,原坝高137m,水库总库容为20.92亿m3,水电站装机容量5万kW。大坝于50年代建成,1987年将大坝加高5m,其总高度达到142m。
  坝址控制流域面积9050km2,基岩为砂岩。其弹性模量低。
  坝顶全长350.5m,其中左岸坝段长120m,右岸坝段长136m,溢流坝段长94.5m。大坝体积123万m3,溢流坝段装有1个鼓形闸门和两边各2个弧形闸门。电站进水口位于右岸坝段的中部。电站厂房布置在右岸坝后。在右岸坝段的底部和中下部分别设1个和3个供水管。溢洪道最大泄量12700m3/s,下游用水跃消能,护坦宽91.4m。
  原有溢洪道泄量不足,仅能通过可能最大洪水的50%。当发生500年一遇洪水,洪峰达到可能最大洪水的65%时,洪水将漫顶,坝顶水深达3m,将破坏大坝。因此对大坝进行了加高。
  大坝加高分两阶段进行,第一阶段包括将大坝堰顶加高5m,并对上游面用后张锚索加固,锚头埋入坝基中,在坝顶张拉,施加预应力。其它相应工事包括加高溢洪道交通桥、调整闸门操作设备、进一步用锚杆和地锚加强水跃消能工。该消能工需要经受最大下泄流量20300m3/s(单宽流量达222m3/s)的考验。至今消能工运用正常,1961年顺利地通过7000m3/s,但下游有点冲刷。第二阶段将增设1座自溃式溢洪道。第一阶段加固工程完成后,可通过最大可能洪水的73%,第二阶段加固工程完成后,可满足通过最大可能洪水的要求。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
沃希变换  沃森变换  霍勒斯.沃波尔  简·沃泊勒教授  德拜-沃勒因子  沃尔 齐格勒反应 
  ©2011 dictall.com