说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 经椎弓根椎体截骨术
1)  pedicle subtraction osteotomy
经椎弓根椎体截骨术
1.
Lumbar spinal pedicle subtraction osteotomy on single segment for correction of kyphosis in ankylosing spondylitis;
腰椎单节段经椎弓根椎体截骨术矫治强直性脊柱炎后凸畸形
2)  pedile subtration osteotomy
经椎弓根截骨
1.
Objective To discuss the perioperative nursing of kyphosis patients with pedile subtration osteotomy at the apical vertebra.
目的探讨经椎弓根截骨内固定矫正脊柱后凸畸形的围术期护理。
3)  transpedical interbody bone grafting
经椎弓根椎体内植骨
1.
Design and preliminary clinical application of transpedical interbody bone grafting apparatus;
经椎弓根椎体内植骨器研制
4)  Transpedicular bone grafting spongisaplasty
经椎弓根椎体植骨成形术
5)  transpedicular spongiosaplasty
经椎弓根椎体成形术
6)  transpedicular bone grafting
经椎弓根植骨
1.
Application of transpedicular bone grafting on osteoporotic thoracolumbar fractures;
经椎弓根植骨在伴有骨质疏松的胸腰椎骨折中的应用
2.
Objective To study the clinical efficacy of transpedicular bone grafting combined with pedicle screw internal fixation in the treatment of elderly patients with thoracolumbar burst fracture.
目的探讨经椎弓根植骨后路内固定治疗老年人胸腰椎爆裂性骨折的临床疗效。
补充资料:上椎叶坝

上椎叶坝

Kamishiba Dam


概  述

  上椎叶坝位于日本宫崎县东臼杵郡椎叶村、耳川水系(Mimigawa)耳川上。混凝土双曲拱坝,最大坝高110m,水库总库容0.92亿m3。工程目的为发电。电站装机容量9万kW。1952年开工,1955年竣工。
  坝址基岩主要为硬砂岩和粘板岩,两者之间夹有变质岩。基岩静弹性模量为70000kg/cm2(平均值)。
  坝址控制流域面积211km2,有效库容0.76亿m3。利用水深45m,最高蓄水位480m,设计洪水流量1800m3/s。
  大坝坝顶长341m,坝体积39万m3。厚高比0.39。大坝按最大主压应力6.35MPa,最大主拉应力-0.66MPa设计。大坝两侧有滑雪道式溢洪道,设置4扇弧形闸门,宽9m,高8.39m。
  坝体开挖总量为30.8万m3(土砂20%,岩石80%)。混凝土最大浇筑能力为2000m3/d。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
椎弓根-肋骨复合体  经皮椎弓根成形术  经椎弓根螺钉固定术  经椎弓根固定技术  经椎弓根钉内固定术  椎弓根-肋骨途径 
  ©2011 dictall.com