1) Zeolite manufacture
![点击朗读](/dictall/images/read.gif)
沸石生产
2) bio-zeolite
![点击朗读](/dictall/images/read.gif)
生物沸石
1.
On the spot, the removal effect of pollutants such as NH 3-N、NO - 3-N 、NO - 2-N、TN and COD in the mimic sewage by bio-zeolite system was studied.
研究了生物沸石床对模拟村镇生活污水中各形态氮及COD等污染物的去除效果 。
3) biological zeolite
![点击朗读](/dictall/images/read.gif)
生物沸石
1.
Pilot-scale study on treatment of polluted source water using biological zeolite filter;
![点击朗读](/dictall/images/read.gif)
生物沸石滤池处理污染水源水的中试研究
2.
A study of biological zeolite reactor as pre-treatment process in micro-polluted water source;
生物沸石反应器作为微污染水源预处理工艺的试验研究
3.
Start-up of biological zeolite filter for removing ammonia nitrogen from contaminated source water
生物沸石滤池去除微污染水源水中氨氮的挂膜启动
4) intergrowth zeolite
![点击朗读](/dictall/images/read.gif)
共生沸石
5) diagenetic zeolite
![点击朗读](/dictall/images/read.gif)
自生沸石
1.
The diagenetic zeolite in the upper part of Dongying Formation of Haiwaihe Oilfield was studied through rock slice, oil immersion method, scanning electronic microscope, electronic probe and x-ray diffraction.
砂岩中自生沸石的形成,使多孔砂岩层转化为致密砂岩层,成为海外河油田的局部盖层,对油藏的形成起到一定的封盖作用。
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条