说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 保载时间
1)  holding time
保载时间
1.
The change of brinell hardness of 12CrlMoV steel with temperature and holding time at sustained load was studied.
12Cr1MoV钢的硬度随温度、保载时间变化规律进行了研究。
2)  loading time
加载时间
1.
Some analysis of the deformation of the isotropic thin sheet under the condition of same pressure amplitude but different loading time was made.
在载荷幅值相同的情况下,对各向同性薄板材料进行了不同加载时间的分析,结果表明:随加载时间的增大,板料的最大变形高度先是增大,然后减小,当加载时间增大到一定程度时,板料的最终变形程度差别不大。
3)  unloading time
卸载时间
1.
Prediction process of unloading time for vacuum preloading and its application
真空预压卸载时间预测方法研究及应用
2.
There are many methods that can be employed to calculate final settlement by field settlement curve,but no formula can be straightly employed to forecast residual settlement and unloading time under bounded unloading settlement velocity in soft soil treatment project.
在堆截预压地基处理工程中,有多种推算最终沉降量的方法,却没有理论公式可直接计算在给定的卸载沉降速率时所对应的剩余主固结沉降量和卸载时间。
3.
With various commonly-used overloading and unloading methods compared,on the basis of our predecessors\' study,and in the light of the Terzaghi\' s one-dimensional consolidation theory,a simplified method for the computation of unloading time is put forward in the paper,the correctness and practicability of which are proved through the practical computation of two projects.
通过对常见的超载卸载方法的比较,在前人研究的基础上,结合太沙基一维固结理论,提出了一种简化计算卸载时间的方法。
4)  surcharge preloading duration
超载时间
1.
It was found that longer surcharge preloading duration could make the total magnitude of deformation of soft clay larger,and the more surcharge preloading duration and the larger OPR,the less magnitude of secondary compression deformation of soft clay after unloading was,compared with that under permanent pressure loading.
工程算例表明,在较长的超载时间情况下,较小的超载比也可以满足工程需要。
5)  time load
时间负载
1.
And the method of calculating time load of the scheduler is given based on the task model.
在雷达任务模型中将每一类驻留请求合并为一种任务,这样可以为调度处理提供最大的灵活性,同时基于此任务模型分析了调度器的时间负载。
6)  Time for Transshipment
转载时间
补充资料:保压时间之概念

 保压时间的设定是为控制保压产生作用的时间,保压时间设定不足将使产品发生尺寸、重量不安定。但保压时间设定太长,又会影响成形效率。适当的保压时间是维持到浇口凝固的时间即可,同时保压大小与保压时间的适当配合,可使程序式保压控制发挥最大效用。
    保压系为了射出终了时密封注道及因体积收缩的补偿,因此保压必须高于内部残留的压力。


    保压时间设定如果在最大有效保压时间之前停止,亦 即保压时间过短,则可能产生下列之结果:1.凹陷;2.气泡;3.重量不足;4.尺寸较小;5.由于熔胶之回流产生内部配向。;6.更高的翘曲,尤其在半结晶性的材料;7.更大尺寸波动;8.收缩率增加设定有效的。


    保压时间至少须到注道固化,一般约为冷 却时间的30%即够。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条