1) drilling speed
钻井进度
2) drilling
钻井
1.
Discussion on increasing slim hole drilling speed;
提高小井眼钻井速度研究
2.
corrosion and protection in drilling;
钻井过程中存在的腐蚀与防腐措施
3.
The mud logging measures and show zone distinguishing under the drilling condition of nitrogen packed-in drilling fluid;
充氮气钻井条件下的录井对策及显示层识别
3) well drilling
钻井
1.
The multi-branch well drilling technical overview and the latest progress;
多分支井钻井技术综述与最新进展
2.
Oil and gas well drilling operation is taken as an example to analyze the feasibility of applying Activity-Based Cost to the petroleum and natural gas industry in China, probes into the cost driver of drilling cost of influencing the well drilling operation of oil-gas.
以钻井作业为例,对我国石油、天然气生产行业运用作业成本法的可行性进行了分析,探讨了影响油气钻井作业成本的成本动因。
3.
In CBM well drilling construction,oil drilling techniques are basically adopted.
在煤层气钻井施工中,基本上采用石油钻井工艺。
4) drilling well
钻井
1.
By analying the cost and safety of drilling wells,summing up the experience,in order to apply the XJ350I workover rig widely in these re- gions.
陆良、保山两气田气层埋藏浅,使用钻机钻井成本居高不下,为了降低钻井成本,从2001年开始在两气田使用 XJ350Ⅰ型修井机钻井,通过对钻井中的成本及安全性等方面的分析、总结,为 XJ350Ⅰ型修井机在钻井中能更好地应用提供依据。
2.
BP model in artificial nerve net model is adopted to predict stuck operating mode in drilling well and artificial nerve net software in predicting system is developed in the paper.
采用人工神经网络模型中BP模型对现场的钻井工况进行卡钻预测 ,并开发了人工神经网络实时卡钻预测系统软件。
3.
In view of difficulties of strata division in the no rock-core drilling wells,delamination features of rock stratum units are identified based on section index characters of Carboniferous and Permian strata in Beijing.
针对无岩芯钻井地层时代划分的困难,文章通过对北京石炭系和二叠系层型剖面标志特征的分析,识别了岩石地层单位的分层标志特征,论述了钻井岩屑地质编录的要求和地层钻探特征,建立了太原组、山西组和石盒子组地球物理测井的物性标志特征,阐明通过岩屑地质编录结合物探测井资料能够较好地对钻井进行地层时代划分。
5) well
钻井
1.
3 coal bed is 450m to 475m,the well structure being second section.
文章总结了14项钻井注意事项,有针对性,可推广。
6) drilling fluid drilling
钻井液钻井
1.
Applying finite element method,the dynamic characteristics of drill string with cone bit in straight hole were simulated,and the whirl,deformation and the dynamic stress in air drilling were compared with the ones in drilling fluid drilling.
应用有限元方法,仿真了空气钻井时斜直井眼中带牙轮钻头钻柱的动力学特性,比较了空气钻井和钻井液钻井条件下钻柱的涡动、变形以及动态应力状况,探讨了空气钻井钻柱失效的动力学机理。
参考词条
补充资料:单项工程施工进度计划
单项工程施工进度计划
定。均衡性是用均衡系数来表示,计算公式如下:工程均衡系数二某分项工程施工期内最高工程量工人人数均衡系数=施工期内最高用工人数l单项工程施工进度计划]确定单项工程中各工序的施工顺序和施工时间的计划,是单位工程施工组织设计的主要组成部分,是具体指导施工的文件。它使单位工程在施工总进度计划和施工企业生产计划的指导下,在规定的期限内,有条不紊地完成拟建工程的施工任务。它的编制的理论依据主要是流水作业原理。其编制步骤一般如下:1.划分工序,确定各工序间的施工先后顺序,并计算工程量,确定各工序的作业时间。2.组成工程组合。由于单位工程所包含的工序数目很多,为了使组织工作简化,一般是把各分项工程(工序)再分组,组成若干分项工程的组合体,即工程组合,把每一工程组合联系起来或组成流水线,然后把它们互相搭接起来而成为整个单位工程的施工进度计划。3.把各工程组合或流水线搭接起来,形成初步的单位工程施工进度计划。组织流水作业的方法,一般是先分别把各工程组合内的分项工程搭起来,组成条条流水线的流水作业,然后再把各条流水线搭起来。各条流水线的搭接方法用累加数列错位减取大差的方法进行。还有一部分不能组织流水或与其他工序无关的工序,根据具体情况搭接安排即可。4.检查、调整、修正初步的单位工程施工进度计划。确定了初步的单位工程施工进度计划以后,就要进行网络时间计算,并检查是否合理。首先要检查工期是否接近最佳工期和符合总进度计划的规定,如果不符则要采取有效办法加以调整。5.计算技术经济指标。单位工程施工进度计划编好后,应评价其经济合理性。一般用均衡系数来衡量,绘制各分项工程施工人数和主要材料消耗量的动态曲线,观察其是否保持均衡。如动态曲线发生高峰低谷频繁波动,则应调整进度,使其趋于均衡稳
说明:补充资料仅用于学习参考,请勿用于其它任何用途。