1) power construction project
电力建设项目
1.
In recent years, many power construction projects have been put into operation due to short electric power supply.
近几年来,由于电力供应紧缺,电力建设项目纷纷上马。
2.
This paper provides an overall analysis on impact of engineering modification to power construction project as well as the current situation of engineering modification management of the power construction project in our country at present stage.
全面分析了工程变更对电力建设项目的影响以及我国现阶段电力建设项目工程变更管理的现状,提出了对电力工程变更管理的若干思考,即实施工程变更的分类控制,运用现代信息化技术改造传统的电力建设项目工程变更管理方法和流程,合理确定工程变更价款以及促进工程变更管理信息化。
3.
With the further development of reform on China\'s power investment system and reform of investment and financing mechanism,investment in power construction projects has been converted to a diversified investment with central and local governments,state-owned and collective enterprises,citizens and foreign investors participating instead of the previous single investment from central government.
随着我国电力投资体制改革的进一步深入和我国投融资体制的改革,电力建设项目由以前单一的中央政府投资,转为中央和地方各级政府、国有和集体企业、公民和外国投资者都可参与电力建设项目投资。
2) electric construction project
电力建设项目
1.
Brief discussion on joint between electric construction project management and international tradition;
浅谈电力建设项目管理与国际惯例接轨
2.
The economic evaluation of the electric construction project under the newinvestment system is studied in this thesis.
本文对新投资体制下电力建设项目的经济评价进行了系统地研究。
4) substation construction project
变电建设项目
1.
It is necessary to evaluate scientifically substation construction project of the electric power supply company with comprehensive fuzzy appraisal.
运用模糊综合评价方法对电力企业变电建设项目进行科学评价,构建基于模糊理论的多级综合测评模型,为电力企业变电建设项目提供快捷可行的评价方法和指导依据。
6) hydropower construction project
水电建设项目
1.
Analysis on several problems in the estimate of power tariff for hydropower construction project;
关于水电建设项目上网电价测算若干问题的浅析
2.
For hydropower construction projects,achieves classification and number preparation is a critical issue in sorting-out and voluming of project documents.
水电建设项目工程档案的分类方案与档号编制,是工程文件归档整理、组卷的关键问题之一。
补充资料:报批建设项目用地
报批建设项目用地
【报批建设项目用地】在审批建设项目用地过程中,按征用土地审批权限规定,需报_L级人民政府进行审查批复的活动。土地管理部门报批建设项目用地,除用地单位正式申报建设用地时按土地审批权限抄报给上级土地管理部门有关附件外,还应向同级人民政府或t级土地管理部门加送以下附件:1.土地管理部门对建设用地的审查意见;2.建设用地征求意见书或有关部门证明材料;3.对建址在城市规划区内的项目,应附城市规划管理部门的审查意见;4.建设项征目拨用地呈报表;5.征〔拨)用地的补偿安置方案和征地费用包干协议,并附征地费用计算依据。需报国务院批准的建设用地,由省级人民政府行文上报。报告、文件按国务院规定份数报送;附件一式三份,其中报国务院一份,抄送国家土地管理局一份,建设项目的国家主管部门一份。建址在城市规划区内的项目,另抄送建设部一份。