1) Station blackout
全厂断电
1.
In the paper,the main phenomena associated with MCCI under one severe accident sequence of station blackout(SBO) add steam-driven auxiliary feed water pump failure for 600 MW nuclear power plant were analyzed by using MELCOR code.
本文以600 MW轻水堆核电厂为对象,选取全厂断电(SBO)叠加汽动辅助给水泵失效诱发的严重事故序列,应用MELCOR程序研究了该序列下发生MCCI的主要现象,着重关注了混凝土的消融速率及氢气的产生速率,为相应的严重事故管理提供支持。
2.
The behaviors including release,transport and final distribution of different kinds of radioactive fission products were analyzed by using MELCOR code for Qinshan-Ⅰ(nuclear power) plant in the case of an accident sequence of station blackout.
利用MELCOR程序分析秦山Ⅰ期核电厂全厂断电事故进程中放射性裂变产物的行为,研究不同性质的裂变产物各自的释放、迁移和最终分布状况。
3.
The progress of core damage under low pressure and high pressure was studied respectively during a station blackout accident.
以1座典型的3环路压水堆核电厂为参考对象,分别研究了发生全厂断电事故时堆芯在低压和高压状态下的损坏进程。
2) Plant power cut off test
全厂断电试验
3) station blackout
全厂断电事故
1.
Analytical tool used in the study of station blackout accident was .
本文通过秦山核电厂全厂断电事故的分析和厂外后果研究,建立将严重事故分析和厂外后果评价上作结合进行的方法,计算结果也可作为制定严重事故管理规程及厂外应急计划的参考。
4) total loss of power
失去所有电源,全厂断电
5) Station blackout with shutdown failure
未能停堆的全厂断电
6) power plant outage
全厂停电
补充资料:用电人享有要求供电人因不可抗力断电的抢修的权利
用电人享有要求供电人因不可抗力断电的抢修的权利:因自然灾害等原因断电时,供电人应当按照国家有关规定及时抢修,以尽早恢复供电,供电人未及时抢修的,造成用电人损失的,应当承担损害赔偿责任。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条