The paper introduces the construction techniques of applying highway fabricated steel beam for assembling and erecting support of truss steel beam over highway,together with truck crane once through assembly and hand winch drag erection,which solves the problem of erecting long span truss steel beam over highway without interfering with traffi
介绍了跨高速公路钢桁梁采用贝雷梁做拼装及架设支架、汽车吊整孔拼装、手摇绞车拖拉架设施工技术 ,解决了在不中断高速公路行车的情况下架设大跨度钢桁梁的问题。
4)  laying caterpillar
铺管用履带拖拉机
5)  tug [英][tʌɡ]  [美][tʌg]
拖船,拖拉
6)  pulling [英][pul]  [美][pʊl]
拖拉
1.
Taking the steel beam work of Gulanghe bridge as example the arrangement of general construction plan is introduced from steel beam assembly, pulling and erection construction and other aspects.
结合古浪河大桥钢梁工程实例 ,就其钢梁总体施工方案的布置进行了介绍 ,从钢梁拼装、上下滑道布置、拖拉架设施工等方面 ,阐述了具体的施工工艺措施 ,并总结了结合梁拖拉的施工体会。
2.
5m wide)for the main span of bridge are erected span by span with hydraulic pulling method,which can be consulted by the similar bridge engineering.
5m宽钢箱梁施工情况的介绍,重点叙述了主跨宽幅钢箱梁分段拖拉安装的施工技术,可供类似桥梁施工参考。
补充资料:《铺设海底电缆管道管理规定》


《铺设海底电缆管道管理规定》
regulations on management of laying submarine cables and pipelines

  Pushe haidi dianlan guandao guanli guiding《铺设海底电缆管道管理规定》(regulationson~a-gelllent ofl娜飞submanne eables and pi州ines)l卿年2月11日国务院颁布,自1989年3月1日起施行。其宗旨在于维护中华人民共和国主权和海洋权益,有序地铺设和保护海底电缆、管道,合理地开发利用海洋空间。中国海洋行政主管部门是铺设海底电缆、管道及为此所进行的“路由”调查、勘测与有关活动的主管机关。该规定在实际管理中,需根据不同管理对象和不同情况区别对待。对于中国的企业、事业单位铺设海底电缆、管道的活动,主管机关主要对其所要铺设的“路由”实施审批,以实现科学、有序的铺设和正常使用与保护;对于外国的公司、企业和其他经济组织或个人在中国的内海、领海范围内铺设海底电缆、管道以及为铺设所进行的“路由”调查、勘探活动,则必须按规定事先向主管机关提出书面申请,获准后方可实施。外国作业者在中国大陆架上进行上述活动,除应事先通知主管机关外,其最后确定的“路由”须经主管机关同意。此外,该规定对海底电缆、管道的保护、维修、改造、拆除和废弃也作了相应的规定,并将收集海底地形、海上构筑物分布等方面的资料以及提供咨询服务作为主管机关的义务加以规定。 (赵恩波)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条