1) rush
[英][rʌʃ] [美][rʌʃ]
突然涌水
1.
The theoretical computation of discharge of rush;
地下工程洞体突然涌水量的理论计算
2) inflow and invasion of groundwater
涌水突水
3) sandy-silt seepage
突水涌砂
1.
Mechanism of sandy-silt seepage deformation in mine under vibration;
振动作用下矿井突水涌砂机理的研究
4) sudden water inrush
突发涌水
1.
Prevention and control of water seepage and sudden water inrush during tunneling;
隧洞施工过程中渗水及突发涌水的防治
5) disater
突涌水
1.
Asseeement of collapse disater during tunnel construction in a underground-water tunnel
某水下隧道施工突涌水与塌方的风险评价
6) water bursting and mud surging
突水涌泥
1.
To explore the safety levels for water bursting and mud surging of tunnel construction process,a safety evaluation index system and its levels are established for water bursting and mud surging of tunnels through the fault fracture zone.
为了探索隧道施工过程中断层破碎带突水涌泥的安全等级,建立了隧道穿越断层破碎带突水涌泥安全评价指标体系及其评价等级。
补充资料:基坑涌水
建筑物基坑开挖深度低于地下水位引起地下水涌入基坑的现象。涌入基坑的水一般来自围岩和坑底。如果基坑底面以下浅部有承压含水层,随着基坑开挖深度增加,承压含水层顶部不透水层的厚度不断减小,强度不断降低,当含水层水头压力大于不透水层强度时,承压水则冲破基坑坑底而涌入基坑中。基坑涌水有时会使坑壁失稳,或因坑壁岩、土体发生机械潜蚀,导致突发性大量涌水而淹没基坑,给施工带来极大困难。
直接影响基坑涌水量的因素有:地下水补给来源及其至基坑的距离;地区大气降水强度、延续时间和入渗系数;基坑围岩的渗透通道、含水层厚度、埋藏深度和围岩的渗透系数等。
为了避免基坑涌水给施工带来困难,基坑开挖前应对可能发生涌水的基坑进行涌水量预报,并根据当地水文地质条件和预报的涌水量,采取适当的防治措施。对于涌水量一般较大的水工建筑物,可采用防渗帷幕或设置抽水井、孔等工程措施。对于涌水量不大的建筑基坑,可选用适当排水能力的水泵抽排;在饱水砂土中施工时,还可采用人工冻结方法。
直接影响基坑涌水量的因素有:地下水补给来源及其至基坑的距离;地区大气降水强度、延续时间和入渗系数;基坑围岩的渗透通道、含水层厚度、埋藏深度和围岩的渗透系数等。
为了避免基坑涌水给施工带来困难,基坑开挖前应对可能发生涌水的基坑进行涌水量预报,并根据当地水文地质条件和预报的涌水量,采取适当的防治措施。对于涌水量一般较大的水工建筑物,可采用防渗帷幕或设置抽水井、孔等工程措施。对于涌水量不大的建筑基坑,可选用适当排水能力的水泵抽排;在饱水砂土中施工时,还可采用人工冻结方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条