1) thermal power station expansion
热电站扩建
2) expansion of hydropower station
水电站扩建增容
3) thermal power station extension project
火电站扩建项目
4) the extension project of the hydropower station
水电站扩建工程
1.
Columnar powerhouse is featured by the merits of safety and saving investment,which is widely applied to the extension project of the hydropower station.
圆筒式厂房具有安全可靠、节省投资等优点,在水电站扩建工程中备受青睐。
5) expansion project of Dahua Hydropower Station
大化电站扩建工程水
6) expansion project of Yantan Hydropower Station
岩滩水电站扩建工程
1.
It is determined that for the expansion project of Yantan Hydropower Station,surrounding rocks at the main powerhouse and the tailrace tunnel are ranked as grade II and grade III respectively.
主要力学参数可按无实测和有实测试验资料两种情况,选用本标准相对应的岩体力学参数和试验统计的折减值,经审核确定,岩滩水电站扩建工程围岩基本质量分级主厂房洞区为Ⅱ级,尾水洞区为Ⅲ级。
补充资料:热电站
即“热电厂”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条