说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 充气速度
1)  Aerating rate
充气速度
2)  maximum aerating velocity
最大充气速度
1.
The operating phase diagram, annular pressure drop, minimum spouting velocity and maximum aerating velocity of a draft tube spouted bed with aeration were studied in a 92 mm-I.
实验采用4种颗粒为实验物料并采用空气为 喷动和弃气气体,通过对实验数据的回归得到用于计算或判别导向管弃气喷动床最小喷动速度和最大充气速度的计算式,以便为其设计和操作提供依据。
3)  Inflation rate
充气速率
4)  Fast filling
快速充气
5)  Filling Velocity
充型速度
1.
The Influence of Various Process Parameters on the Liquid Metal Filling Velocity in Gray Iron Casting Produced by EPC V Process;
铸铁件EPC-V法工艺因素对充型速度的影响
2.
The result indicats that there are few blowholes,inclusions except misrun in the casting with the filling velocity of 25mm/s,and the casting was formed with some blowholes、inclusions with the filling velocity of 40mm/s,while the casting was form.
研究了薄壁铝合金铸件真空吸铸充型速度对其内部质量的影响,对一种200mm×180mm,壁厚为2。
3.
The metal filling velocity increases with the reduction of pattern density and coating thickness, and the increase of pouring temperature.
研究了模样密度、涂层厚度、浇注温度、真空度等工艺参数对可控气压下镁合金消失模铸造时液态金属的充填形态和充型速度的影响,以及充型速度与充型形态之间的关系。
6)  filling speed
充型速度
1.
The filling speed of lost foam cast iron casting was measured by use of an integrated set of experimental equipment and a specially designed computer acquisition system.
研究了负压度、模样密度、浇注温度、金属静压头等工艺因素对消失模铸铁件充型速度的影响规律。
补充资料:膀胱充气造影术


膀胱充气造影术


一种诊断膀胱疾病的X线检查方法。将导管由尿道插入膀胱,抽出余尿,注入空气,以观察膀胱的大小、位置、形态以及和邻近器官的关系。常用于疑为膀胱、盆腔、前列腺肿瘤及前置胎盘等病人。但大量血尿者不宜做此项检查,以免发生气栓。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条