说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超标风险
1)  risk of exceeding criterion
超标风险
1.
In this paper a method for calculating risk of exceeding criterion(REC)in river was put forward on the basis of mathematical simulation analysis(MSA) for toxicants'leaking behaviour.
在对有毒物质河流泄漏行为进行数学模拟分析的基础上,提出了一种计算河流断面超标风险的方法。
2)  Annual flood risk model
年超标洪水风险率
3)  excess risk
超额风险
1.
Funds gap of securities firms is somewhat one kind of that of excess credit,which is mainly caused by excess risk faced by them.
券商的资金缺口是一种超额信贷资金缺口 ,这种缺口主要是由券商的超额风险产生的。
4)  risk index
风险指标
1.
Voltage security assessment for on-line risk index and its sensitivity;
电压安全在线风险指标及其灵敏度评估
2.
Analysis on the applicability of water-supply risk indexes for water resources system during drought period;
干旱期水资源系统供水风险指标适用性分析
3.
According to the practice of control chart analysis (CCA) in the management of coal mine safety, it is showed that the application of control chart analysis in the statistical analysis of risk indexes can scientifically judge the developing trend of risk indexes, assess the improvement or degeneration of system and verify the effectiveness of safety measures.
根据实践,介绍控制图分析法在煤矿安全管理中的应用,将控制图法应用于安全风险指标的统计分析可以对风险指标的发展趋势作出科学判断,评价系统安全状态是否有明显好转或恶化,检验安全管理及技术措施是否有效。
5)  risk standard
风险标准
1.
Earth dam overtopping risk standard of reservoir is studied particularly.
本文运用漫坝风险分析理论,在综合考虑洪水、风浪、库容、泄水能力等方面不确定性的基础上,建立土坝对抗洪水与风浪共同作用的漫坝风险模型,提出用"积分-一次二阶矩法"计算漫坝风险,并详细探讨水库土坝漫坝风险标准问题。
2.
In this paper, overtopping risk and risk standard of Cheng Bi He Reservoir are studied.
应用风险分析理论对澄碧河水库大坝进行了漫坝风险研究,计算了土坝的漫坝风险,探讨了该土坝的漫坝风险标准。
3.
The credit risk measure way supplies a total sides risk control mechanism for financial institutions and also a basic risk standard for bank and supervision.
信用风险计量为金融机构提供了一种全方位的信用风险控制机制;为银行和监管部门提供了一个基本的风险标准;是加强和完善我国金融风险管理的重要手段;是金融创新和推动我国金融国际化的需要。
6)  bidding risk
投标风险
1.
Research of constructional engineering project bidding risk analysis based on rough sets and support vector machine;
基于粗糙集和SVM的工程项目投标风险研究
2.
Aimed at the uncertainty and risk analysis in project bidding, the knowledge expression system of bidding risk decision analysis is described.
针对工程项目投标过程中的不确定性和风险分析问题 ,从Rough集的基本体系出发 ,给出投标风险决策分析的知识表达系统 ,运用Rough集理论和方法对投标风险决策表的属性及属性值进行约简 ,挖掘其中隐含的知识 ,从而得出投标风险决策的最小决策算法 ,帮助决策者迅速对工程项目的投标风险进行评估和预
3.
Bidding risk should be evaluated accurately in order to avoid bidding risk in international project and reduce economic loss.
为规避国际工程投标风险,减少企业经济损失,应对工程投标风险进行全面准确的评估,将信息熵概念引入工程投标风险评估中,克服了以往主观决策与定性分析的不足,达到了客观评估工程投标风险、提高对工程投标的准确决策的目的。
补充资料:风险投资的风险

风险投资的风险是指投资活动中人们不希望的后果出现的潜在可能性。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条