1)  embeded length
埋长
2)  long-deep tunnel
深埋长隧
1.
The long-deep tunnels under complex geological conditions always have water-fathering problems which affect the construction safety and course.
复杂条件下的深埋长隧涌突水是常见的主要灾害之一 ,严重威胁着现场施工安全及进度。
3)  deep-buried long tunnel
深埋长隧道
1.
Once deep-buried long tunnel is constructed in soft rock under high crustal stress,rheology of soft rock is an outstanding engineering geology problem.
在高地应力环境下的软弱围岩中修建深埋长隧道,软弱围岩流变一是个突出的工程地质问题。
2.
Once deep-buried long tunnel is constructed in soft rock under high crustal stress,rheology of soft rock is an outstandingengineering geology problem.
在高地应力环境下的软弱国岩中修建深埋长隧道,软弱围岩流变一是个突出的工程地质问题。
4)  deeply buried long tunnel
深埋长隧洞
1.
In this paper, the problems of high-pressure blow that possibly occurs during the construction of deeply buried long tunnels are discussed.
针对深埋长隧洞施工中可能出现的高压大流量涌水问题,通过国外3个工程施工实例进行分析,提出地质勘测、隧洞布置和处理措施方面的意见,尤其从环保角度比较了止水工和排水工的不同,推荐了止水工具体实施方法。
5)  deep-lying long tunnel
深埋长隧道
1.
Prediction and prevention of harmful gas in deep-lying long tunnel;
埋长隧道有害气体的预测与防治
2.
Hazard caused by harmful gases is one of the main geological hazards of deep-lying long tunnels.
有害气体是深埋长隧道的主要地质灾害现象之一。
6)  engineering geological problems of deep-seated long tunnel
深埋长隧洞工程地质问题
补充资料:长岑长
1.《后汉书.崔骃传》﹕"宪(窦宪)擅权骄恣﹐骃数谏之。及出击匈奴﹐道路愈多不法﹐骃为主簿﹐前后奏记数十﹐指切长短。宪不能容﹐稍疏之﹐因察骃高第﹐出为长岑长。"李贤注﹕"长岑﹐县﹐属乐浪郡﹐其地在辽东。"后用以称颂不为权贵所容之官吏。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。