说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 爆破除垢
1)  blasting ash-cleaning
爆破除垢
1.
In this paper effects of blasting ash-cleaning for the ash bedding, explosive, steel pipe and loading structure are analyzed, which provide a theoretical basis for the parameters design of blasting ash-cleaning.
本文分析了灰垢的层理、炸药、钢管和装药结构对爆破除垢效果的影响,为爆破除垢参数设计提供了一定的理论依
2)  demolition blasting
拆除爆破
1.
Analog test of stemming effect for demolition blasting of cofferdam of TGP;
三峡RCC围堰拆除爆破炮孔封堵效果模拟试验
2.
Xinhua molybdenum industry company refrigerator demolition blasting;
新华钼业公司冷冻库拆除爆破
3.
Cofferdam demolition blasting and vibration monitoring for Yahekou Thermal Power Station;
鸭河口火电厂取水口围堰拆除爆破与振动观测
3)  Demolition blasting
爆破拆除
1.
The design and implementation of demolition blasting used asymmetry directional window of a post reinforced thin wall round water tower is introduced in details.
详细介绍了一例采用非对称定向窗爆破拆除后加固式薄壁筒形水塔的设计情况 ,分析了该水塔的结构特点对爆破方案设计的影
2.
This demolition blasting affords valuable experience worth reference for similar engineering works.
在复杂的建筑物群中采用双层斜型爆破切口折叠定向倾倒设计方案 ,成功进行了内蒙古医学院四层连体危楼的爆破拆除 。
3.
The paper describes the demolition blasting of a thin shell reinforced concrete water tower under complicated environment condition.
介绍了在复杂环境下薄壁钢筋混凝土水塔的爆破拆除。
4)  blasting demolition
拆除爆破
1.
The design of blasting demolition, implementation and some technical measures taken in the complex environment for demolishing workshops and chimney in Liancheng Aluminum Plant are introduced.
介绍了复杂环境下对厂房及烟囱拆除爆破设计、施工和采取的措施。
2.
The general situation of development on numerical simulation model of blasting demolition both at home and abroad as well as its application in blasting demolition of buildings are introduced.
通过总结文献资料 ,提出了拆除爆破建模与仿真的原理、方法和步骤 ,并介绍了国内外的工程爆破数学模型发展概况 ,探讨了数值模型在建 (构 )筑物拆除爆破模拟方面的应
3.
Successful experiences in blasting demolition of an underwater cofferdam of Dayuandu power station is introduced briefly, which are useful for the designing other similar blasting demolition project.
介绍了大源渡航电枢纽工程河中混凝土纵向围堰上游连接段水下拆除爆破的成功经验。
5)  explosive demolition
爆破拆除
1.
The significance,principle and method of the pretreatment for directional explosive demolition of the tall cylinder building are expounded.
针对水塔、烟囱、储料罐等高耸圆筒形建筑物的定向爆破拆除,阐述了预处理的意义、原则和方法,通过爆破工程实践得出的经验对预处理技术问题做一小结,供参考。
2.
In this paper, the author introduces the explosive demolition scheme of the building with triangle projective planum in detail, and puts forward some problems to be noticed to this type of building in demolition.
本文较详细地介绍了投影平面呈三角形的砖混结构楼房的爆破拆除方案 ,并根据本次实爆的情况 ,提出了对该类型楼房实施爆破拆除时应注意的几个问题。
3.
The explosive demolition implement is successful.
介绍了某室内体育训练馆的爆破拆除方案及施工技术。
6)  controlled blasting
拆除爆破
1.
A 17-storeyed high building in Hefei was demolished by controlled blasting.
理论计算和爆破实践表明该网路设计是可靠的,能满足巨大炮孔数量楼房拆除爆破的需要。
补充资料:除垢
【除垢】
  除垢者,谓澡浴身体,则诸垢秽悉皆除去也。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条