1) water injection test
注水试验
1.
Discussion on water injection test inapplicability to the permeability test for homogeneous earth dam
关于注水试验不适合均质土坝坝体渗透性测试的讨论
2.
In accordance with the case of large mining depth in Xingdong coal mine,study on coal floor strata failure depth test of working face 2121 was carried out by water injection test.
针对邢东矿大采深的情况,利用现场底板注水试验对2121工作面底板采动破坏深度进行了测试研究,依据单位注水量的动态变化以及注水孔与采线之间的距离关系,确定了底板破坏深度。
2) Water injection experiment
注水试验
1.
The well excavation inspection, water injection experiment and core boring prove that high pressure swing guniting method for curtain grouting is feasible and parameters used in construction are correct.
通过围井开挖检查、围井注水试验及钻孔取芯检查 ,验证了设计采用高压摆喷方法进行防渗帷幕灌浆是可行的 ,所采用的施工参数是正确的。
2.
decreased sensitivity,In order to improve observation accuracy of infiltration,water injection experiment,scouring and silting were taken.
为提高渗透观测精度,江口水电厂对各测压管进行注水试验和冲淤。
3) water injection experimental region
注水试验区
1.
Micro-fractures and high permeability channel are the main factor controlling injected water move quickly in accordance with the behavior well test of Wang 84 well group in water injection experimental region in Yaodian oilfield.
姚店油田注水试验区王84井组微量物质示踪剂动态监测结果分析表明,井间微裂缝和高渗条带是控制注入水快速突破的主要因素。
4) laboratory waterflood experiment
实验室注水试验
6) scaling testing by injecting water pressure
注水压试验结垢
补充资料:高压注水
分子式:
CAS号:
性质:当压水堆一次冷却剂回路出现小破口时,反应堆系统的压力下降不多。由正常运行的11.5MPa下降到约11MPa时,高压注水系统投入运行。将含硼水注入反应堆冷却剂进堆和出堆的管道中,以迅速补充反应堆所丧失的冷却剂。高压注水系统是应急堆芯冷却系统的一个子系统。
CAS号:
性质:当压水堆一次冷却剂回路出现小破口时,反应堆系统的压力下降不多。由正常运行的11.5MPa下降到约11MPa时,高压注水系统投入运行。将含硼水注入反应堆冷却剂进堆和出堆的管道中,以迅速补充反应堆所丧失的冷却剂。高压注水系统是应急堆芯冷却系统的一个子系统。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条