说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 装置布点
1)  phosphoric acid plant site
装置布点
2)  plant arrangement
装置布置
3)  test point arrangement
测点布置
1.
Testing purpose,model design principle,testing case,loading program,strain and deformation test point arrangement of the first Zhongshan Bridge test model are introduced in detail.
详细介绍了中山一桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,并给出了几个主要荷载工况的试验数据;同时还建立了空间板壳有限元模型,指导试验加载。
4)  well-point layout
井点布置
1.
According to the technical requirement of the well-point layout principle,well-point canal inbuilt,well-point structure construction,it represents well-point precipitation construction technology in detail,brings forward the matters need attention in the well-point system,and does research to the risk measures to the peripheral environment in the controlling well-point precipitation.
通过对井点布置原则、井点管的埋设、井点结构施工的技术要求等方面详细地阐述了井点降水的施工工艺,并提出了井点系统的使用注意事项,最后就控制井点降水对周边环境危害的措施进行了研究。
5)  sensor placement
测点布置
1.
First,making use of modal analyses of the tower,taking the non-diagonal elements of MAC matrix as target functions,increasing or decreasing the number of degree of freedom(DOF),the optimal sensor placement of the tower is obtained by choosing the non-diagonal elements of MAC matrix to be the least.
本文探讨了大跨桥梁索塔有限元模型在传感器振动测点布置方面的应用,首先对索塔有限元模型进行模态分析,采用以MAC矩阵的非对角元素为目标函数,通过增加或减少测点自由度使MAC矩阵的非对角元素趋于最小来确定索塔环境振动测点位置的最优布置。
2.
Based on monitoring works on tunnel of Hang-qian highway, the monitoring item selection and sensor placement optimization are discussed in this paper.
本文通过在杭千高速隧道群监测的实践,对隧道监测项目的选择和测点布置问题进行了详细阐述,提出了在不同监测目的下选择合适的监测项目和合理的测点布置,可以起到事半功倍的效果,以供隧道监测工作者参考。
6)  layout character
布置特点
1.
This paper presents the design thinking,layout character and technical parameters of the suburban bus LCK6830G3.
介绍LCK6830G3型城郊客车的设计思路、布置特点及技术参数。
补充资料:封口装置——滚纹装置

封口装置——滚纹装置
 

 

 

 

 
文章编辑:moji
文章来源:

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条