By using the method to a hypothesis problem,a very good result was gained and the effectiveness of the said method for the optimal dewatering well location design was verified.
本文讨论了修正单纯形优化计算的方法和理论,以总疏水量最小为目标函数,以井位和疏干水量为决策变量,以不同点的疏干降深为控制约束条件,推导了利用单纯形方法对矿井疏干井群进行优化设计的计算方法,并通过一假设事例进行了求解计算,取得了很好的效果。
2.
This paper discusses the optimal dewatering well location and pumping rates desing by using modified simplex emthod.
疏水降压或地下水的疏干是大水矿井常用的防治水技术措施和手段之一,但对疏水降压工程的不同设计会对疏干效果和疏排水量带来很大的影响,本文讨论了修正单纯形优化计算的方法和理论,以总疏水量最小为目标函数,以疏干水量为决策变量,以不同点的疏干降深为控制约束条件,推导了利用单纯形方法对矿井疏干井群进行优化设计的计算方法,并通过一假设事例进行了求解计算,取得了很好的效果。
2) draining well
疏干井
3) pits for draining
降水疏干井
4) mine dewatering water
矿井疏干水
5) well group interference
井群干扰
6) interferential well group
干扰井群
1.
On basis of the underground passage project between south and north square of Changchun Station,the dewatering calculation method for interferential well group in weak aquifer is presented.
在弱含水层干扰井群降水计算时,不能按各单井等涌水量考虑,且不一定所有井都对计算点水位降深产生干扰。