1) 20# boom
20#吊杆
1.
The data statistics of mechanical property of three years for 20# boom after normalization treatment of our factory are done and get regression equation σb=181+2.
对我厂正火处理后的20#吊杆进行了3年的力学性能数据统计,采用回归方法求出了回归方程σb=181+2。
2) suspender
[英][sə'spendə(r)] [美][sə'spɛndɚ]
吊杆
1.
Spatial analysis of suspender tensile force for the pushan CFST through arch bridge;
蒲山系杆拱桥吊杆张拉力的空间计算分析
2.
Study on examination method of the arch bridge suspender;
拱桥吊杆检查方法的研究
3.
Loading effects FBG monitoring system and safety evaluation of arch bridge suspenders;
拱桥吊杆荷载效应光纤光栅监测与安全评定
3) hanger
[英]['hæŋə(r)] [美]['hæŋɚ]
吊杆
1.
The method of computing initial stretching force of the hanger of tied arch bridge and construction control;
确定系杆拱桥吊杆初始张拉力方案及施工控制
2.
Analysis for influence line characteristic on simple birder composite arch bridge with different disposal of hangers;
不同吊杆布置形式下简支梁拱组合体系拱桥的影响线特性分析
3.
Numerical Simulation of Vortex-Induced Vibration of Steel Truss Arch Bridge Hanger
钢桁拱桥吊杆涡激振动仿真分析
4) hanger rod
吊杆
1.
Application of hanger rod with BBRV anchorage and HiAm anchorage to half through arch bridges;
一种特殊结构的吊杆在中承式拱桥中的应用
2.
Through careful analysis,we found that the deformation of tensile force of rod should exert on nondeformed structure system,but the hanger rod was often used in deformed structure in practical projects until it reached the design value.
经过仔细分析发现,模拟吊杆力的变形量是施加在未变形的结构体系上的,实际工程却是在已经变形的结构上张拉吊杆,直至达到设计值为止。
3.
The stay wire of the hanger rod was changed in an arch bridge construction; the article presents the change reasons,preparation beforehand and the process in hope that it may provide reference for the similar work.
文章以某拱桥吊杆更换拉索为例,主要阐述了换索原因、施工前期准备、施工工艺等情况,以期为同类型桥梁换索施工提供借鉴。
5) boom
[英][bu:m] [美][bum]
吊杆
1.
Computer based DC speed control of boom system and its precise positioning;
计算机控制直流调速吊杆系统及其准确定位
2.
Exploration on tie bar arch bridge assembling construction and boom rope force regulation;
系杆拱桥装配施工和吊杆索力调整探索
3.
For studying the H-shaped boom of three large arches on the Jiujiang’s Yangtze RiverBridge,its low-frequency modal paremeters and wind-induced vibration parameters are measured.
以九江长江大桥三大拱H形吊杆为对象,测定了各吊杆的低频振动模态参数和风致振动特性参数,确定了实桥吊杆发生风致振动时的风速锁定范围和最不利风向,为后续的实桥吊杆抑振措施研究提供了重要的试验数据。
6) anchor crane
吊锚吊杆
补充资料:吊杆装置
见船舶起货设备。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条