说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 混汞尾矿
1)  Amalgamating ore tailing
混汞尾矿
1.
Howerer,Amalgamating ore tailing is first treated chemically,the crystal stucture of carrier ore is danaged,and the fing scattered gold becones exposed,so the leaching efficiency can reach up to 83.
混汞尾矿直接用于制粒堆浸 ,金浸出率很低 ,只有 54。
2)  Tailings mixture
尾矿混合物
3)  Mixed tailings material
混合尾矿料
4)  iron railings concrete
铁尾矿混凝土
5)  mercury mine
汞矿
1.
8% respectivey, The methylmercury levels of human hair for mercury mine workers, children and pregnam women living near the mine area have been compared with that of those living at nonpol luted .
并对我国某汞矿区职工、儿童及产妇发样分析结果作了讨论。
6)  amalgamation [英][ə,mælgə'meiʃən]  [美][ə,mælgə'meʃən]
混汞
1.
A combined separation process of amalgamation with cyanidc leaching in tank is applied to the gold deposits in North Guilin with a flow chart of raw material - crushing- amalgamation-leaching-replacement-smelting, which improved gold recovery and received an ideal benefit.
对桂北金矿利用混汞与氰化渗滤池浸联合选矿工艺,采用原矿石-破碎-混汞-渗滤浸取 -置换-冶炼工艺流程,提高金回收率,取得较好的经济效益。
2.
In this article amalgamation flotation combined flowsheet and adaptable technology additions was adopted basing on the full demonstration and experimental study,in addition of head grade:Au 7.
在充分论证和试验研究基础上 ,采用混汞—浮选联合流程及适宜的工艺条件 ,在原矿品位为Au7。
补充资料:钢铁厂矿山利用尾矿筑尾矿坝


钢铁厂矿山利用尾矿筑尾矿坝


钢铁厂矿山利用尾矿筑尾矿坝
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条