1) collecting flue gas tube of sintering machine
烧结机集气管
2) fritting machine waste gas
烧结机废气
3) waste gas of sinter machine discharge end
烧结机尾烟气
4) clinker aggregate
烧结集料
5) combustion header
燃烧室集气管,燃气收集器
6) sintering waste gas
烧结烟气
1.
As a result, the dense flow absorber process was selected to treat the sintering waste gas.
根据石家庄钢铁股份有限责任公司烧结机机头烟尘特点,对几种不同的处理方法进行比较,提出了采用密相干塔烟气脱硫的方案,来进行烧结烟气脱硫。
2.
In the near future the technologies for simultaneous desulfurzation and denitrition technologies of sintering waste gas will become a big hot point in the fields of waste gas desulfurization and denitrification at home and abroad.
鉴于烧结烟气的脱硫脱硝技术是目前国内外脱硫脱硝研究的一大热点,介绍了典型的可用于烧结烟气脱硫脱硝技术以及目前国内外新兴的烟气同时脱硫脱硝技术,并对各种技术的优缺点进行了分析。
3.
3 sintering plant were introduced in detail,which can be used as reference for sintering waste gas desulphurization.
本文详细介绍了NID脱硫工艺的原理、主要设备、工艺流程、技术特点及在三烧的应用情况,以期为烧结烟气脱硫提供参考。
补充资料:集气管
集气管
collecting main
Jlqlguall集气管(eolleeting main)汇集从各炭化室导出的粗煤气的焦炉附属设备。集气管是由钢板焊接或铆接而成的圆形或槽形管道,安装在由炉柱支承的许多托架上,与上升管相连。为了便于氨水和煤焦油从集气管流出,集气管朝氨水流出口方向有6~10%。的倾斜度。各炭化室的粗煤气经上升管进入集气管。由炭化室逸出的粗煤气温度约800℃。在上升管桥管和集气管内,粗煤气被喷洒的热氨水降温并冷凝出大部分煤焦油,集气管中粗煤气冷却的极限温度是粗煤气的绝热饱和温度。集气管压力是保持各炭化室底部在整个结焦过程内都处于正压的关键。为调节集气管压力,在集气管和吸气管间的‘,ll”型管上,设有手动和自动调节翻板。集气管内的氨水、煤焦油和焦油渣通过焦油盒导入吸气管。沿集气管全长设有若干焦油渣清扫孔。集气管上设有放散管,以便在集气管压力过大时放散粗煤气。在集气管端部设有蒸汽清扫管、工业水管和氨水管,以备在焦炉开工和发生事故时使用。 (李哲浩葛茂弟李清田)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条