1)  hydraulic loading rate
布水负荷率
2)  water arrangement
布水
3)  distributive holes
布水孔
1.
This paper intruduce the question about the AHBLG GRP crosscurrent water in a sulphuric acid factory is overfiowed seriously and the water's diversion is out of shape;proposed the improvement plan that made the aperture of the distributive holes in the launder fromφ10 toφ16;After implementation,it has saved 2 millions tons productive used water every year.
介绍了某厂硫酸系统AHBLG全玻璃钢横流式凉水塔漫水严重、分水板变形的问题;提出了将布水槽上布水孔孔径由Φ10扩大到Φ16的改造方案;实施后,每年节约生产用水200万t。
4)  distributing trough
布水槽
1.
In order to improve the problems from HDT-55 truntable filters, measures are taken as follows:cloth water and distributing trough are rotated clock-wise at 10~15°, athodyd combustion chamber enlarged, filter cloth washing nozzle, ring-shaped pipe material improved.
为了改进HDT-55转台过滤机使用中暴露出的布料布水槽角度不合理、栈桥及支架腐蚀严重、滤布冲洗水喷头易堵、钢衬胶真空环形管易起泡等问题,采取了如下措施:将布水、布料槽顺时针转10~15°,增加吸气室空间,改进滤布冲洗喷头总成,改进环形管材质等。
5)  stage influents
递进布水
6)  influent distribution system
布水系统
1.
On the other hand,the design of UASB system must consider the separation of UASB system、three-phase separator、influent distribution system and culture of granular sludge.
上流式厌氧污泥床(UASB)处理PTA污水可取得良好的效果,在工艺设计的过程中需要考虑到PTA污水在事故状态下的收集和污水的水质调节;UASB厌氧系统的设计要注意处理单元的合理划分、布水系统、三相分离器以及污泥培养四个方面的问题。
参考词条
补充资料:布水
1.瀑布。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。