说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 整体节点
1)  integral joint
整体节点
1.
Fatigue test on integral joint of the main truss of the Baling River Bridge
坝陵河大桥钢桁加劲梁主桁架整体节点疲劳试验
2.
Finite element analysis of integral joint in three-truss continuous steel truss arch bridge
三主桁连续钢桁拱桥整体节点有限元分析
3.
Along with the development of scientice and technology, steel bridge s span and the development of welding technology have got a great developement, a new-type steel bridge s structure integral joint has been regular adopted in the last few years.
随着科学技术的进步,钢桥的跨度与焊接技术取得了较大的发展,钢梁整体节点这一新型结构近几年来被经常采用。
2)  monolithic joint
整体节点
1.
The full-scale fatigue test of the connection structural details between track cross beams and monolithic joints in the Chongqing Caiyuanba Yangtze-river Bridge,the first long-span rail-cum-road bridge in China,is introduced.
介绍国内首座大跨度公轨两用桥——重庆菜园坝长江大桥轨道横梁与整体节点连接的足尺模型疲劳试验。
2.
The full-scale fatigue test of connection structure details between floor beams and monolithic joints was carried out on the Caiyuanba Yangtze River bridge in Chongqing.
对重庆菜园坝长江大桥轨道横梁与整体节点的连结构造细节进行了足尺模型疲劳试验。
3.
In the last few years, monolithic joint has been gradually adopted in the long span steel truss bridge.
近年来,整体节点在大跨度钢桁梁桥中逐渐被采用。
3)  integral node
整体节点
1.
By means of ANSYS, a major FEA software, the strength analysis of integral node of steel truss girder is conducted.
应用 ANSYS有限元程序对工程上较为先进的钢桁梁整体节点进行了强度分析 ,得出了在最大载荷作用情况下整体节点的应力云图 ,并与之前进行的大比例尺模型试验所测得的整体节点应力分布规律进行比较 ,从而证明了整体节点构造设计的合理性 ,并对整体节点的性能给出了总的评价 。
2.
In this paper,the structural shape,feature and welding technique of integral node of steel truss girder are discussed.
介绍了钢桁梁整体节点构造的结构形式、特点及焊接技术要求 ;通过整体节点模型试验及有限元分析 ,描述和分析了整体节点关键构造细节的应力分布情况 ,从而证明了整体节点构造设计的合理性、安全
4)  integral panel point
整体节点
1.
The still more advanced welded integral panel points used for Wuhu Changjiang River Bridge are introduced.
介绍了芜湖长江大桥采用的更为先进的焊接整体节点
2.
The integral panel points were used for the steel truss girder of Zhongning Huanghe River Bridge and the precision of hole boring in the panel points was of vital importance owing to the intersecting of steel members from different planes at the points.
中宁黄河特大桥钢桁梁采用整体节点,由于在整体节点处有不同平面的杆件交汇,所以制孔的精度十分重要。
3.
The most common problem of the integral panel point of a steel bridge is the fatigue cracks occurring at the welding seams of the point and the welding residual stress is deemed as one of the important influential factors that causes the cracks.
钢桥整体节点最常见的问题是焊缝处出现疲劳裂纹,焊接残余应力是重要影响因素之一。
5)  Solid joint
整体节点
1.
he steel truss with solid joints is a new technique of steel bridge developed abroad just recently 20 years.
整体节点钢梁是国外近20年来刚刚兴起的新型钢梁技术,我国在京九线孙口黄河大桥上首次采用。
6)  whole node
整体节点
1.
Welding of the whole nodes for new deck structure in railway steel bridge
铁路钢桥新型桥面整体节点的焊接
2.
Because the special structure of the whole node used by Nanjing Dashengguan Yangze River Bridge at the first time,the traditional program for lay-outing and drilling is unsatisfied,it is urgent to research a new program for the special structure of the truss arch.
由于大胜关桥桁拱首次采用整体节点这一特殊的结构形式,杆件划线、制孔均不能采用传统的划线、制孔方案,特重新研究一种针对桁拱特殊结构形式的划线、制孔工艺方法。
补充资料:电力网节点编号优化


电力网节点编号优化
network nodes order optimization

d旧nl!wong Jled一anb旧nhoo youhuo电力网节点编号优化(network nodes order。Ptimization)用稀疏矩阵技术求解电力系统网络方程时,为了节省计算机内存和加快计算速度,按照一定规则编排电力网各个节点次序。 在电力系统计算中,网络方程通常采用导纳矩阵方程的形式,它的求解多采用高斯消去法和直接三角分解等(见网络方程求解方法)。导纳矩阵是零元素很多的稀硫矩阵,对它进行消元或三角分解后所得的三角矩阵,要增加一些称为注人元的非零元素。为节约计算机内存及避免对零元素的不必要运算,在计算机中一般只贮存三角矩阵中的非零元素.因此,三角矩阵中非零元素的个数,直接影响计算机内存的需要量及程序计算速度.导纳矩阵非零元素的分布直接影响消元或分解后三角矩阵非零元素的数目.而网络节点编号次序又与导纳矩阵非零元素的分布密切相关(见图1),因此,电力网节点编号优化是求解网络方程前的一项重要工作。┌─────┬────┬─────────┬────┐│节点.号.形│导纳矩阵│消元或分解后三角阵│注入元致│├─────┼────┼─────────┼────┤│么 │麟 │魏 │弓 ││21月 │ │ │ │├─────┼────┼─────────┼────┤│上 │瀚 │魏 │l │├─────┼────┼─────────┼────┤│。~主钩 │麟 │继 │(j │└─────┴────┴─────────┴────┘ 图1节点编号对注入元的影响 ·一非零元素;X一非零注入元紊 节点编号的最优化是寻求一种使注人元素数目最少的节点编号方案.对n个节点的电力网来说,其节点编号方案可以有川种,选最优的工作量将非常大.因此,在实际中往往采取一些简化的方法对节点编号进行优化,并不一定追求“最优”。 根据消元的计算公式或星形一三角形变换规则(见图2),每消去一个节点i,新增加的元素数为八一冬Ji(J‘一,)一及 ‘(1) l、、一一洲声图2消去节点1网络变化示意图式中J‘为在消去节点i时节点i的出线数;及为在消去节点i时与节点i有连线的各节点之间已有的连线数.常用的一些节点编号优化方案,大都根据式(1)或对其作一些简化得到的,主要可分以下三类。 (l)静态按最少出线数编号。对式(1)略去八项,视去为常数,即不考虑消去前面节点对节点i的出线数的影响,因此,也称静态优化法。该方法简单、快速、应用极为普遍。 (2)动态按最少出线数编号。对式(1)略去八项,但考虑Ji的变化,即考虑消去前面节点对节点i的出线数的影响,因此,也称半动态优化法。 (3)动态按增加出线数最少编号.对式(1)考虑及项和J‘的变化,即动态按增加出线数最少的原则编号,也称动态优化法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条