1) waste sludge
废泥渣
1.
Industrial grade zinc sulfate is produced by waste sludge containing zinc and sulfuric acid as raw materials.
以含锌废泥渣和硫酸为原料生产工业级硫酸锌 ,经试验锌利用率 90 %以上 ,硫酸锌质量达到HG/T2 32 6 - 92标准的要求。
2) wastewater mud
废水泥渣
3) red mud and other slags
赤泥等工业废渣
4) paste mud of waste Lead storage batteries
废铅酸蓄电池渣泥
1.
the processes of PbSO_(4)desulfuration and PbO_(2) reduction were studied from paste mud of waste Lead storage batteries by hydrometallurgy.
对废铅酸蓄电池渣泥中硫酸铅脱硫和二氧化铅还原湿法过程进行研究。
5) waste residue
废渣
1.
Study on the leaching toxicity and safe disposal of manganese sulphate waste residue;
硫酸锰废渣的浸出毒性及处理研究
2.
Study on the extraction procedure toxicity and leaching property of manganese sulfate waste residue;
硫酸锰废渣浸出毒性及淋溶特性研究
3.
Improvement of Determination Method of Pb,Cr,Ba and As in Waste Residue of Printing Note Factory;
废渣中Pb、Cr、Ba、As测定方法的改进
6) waste residues
废渣
1.
The paper summarizes the treatment methods of overhaul waste residues in tanks generated in the production process of electrolytic aluminum plant and makes a detail analysis on causes of the overhaul waste residues,environmental effects,transportation mode,selection of slag yard site,stockpiling method and recycling of waster residues for reuse and so forth.
阐述了电解铝厂生产过程中产生的电解槽大修废渣的处理方式,包括对大修渣的产生原因、环境影响、运输方式、渣场场址选择、堆存方式及废渣的回收再利用等作了详细的分析。
2.
Physicochemical analysis,leaching toxicity test and biotoxicity tests were used to investigate the leaching toxicity and biotoxicity of waste residues from MoO3 production under simulated acid rain conditions.
利用理化分析、浸出毒性分析、生物毒性试验相结合研究了三氧化钼(MoO3)生产排放的废渣在不同模拟酸雨条件下的浸出毒性及生物毒性。
3.
The paper summarizes the treatment methods of overhaul waste residues in tanks generated in the production process of electrolytic aluminum plant and makes a detail analysis on causes of the overhaul waste residues, environmental effects, transportation mode, selection of slag yard site, stockpiling method and recycling of waster residues for reuse and so forth.
阐述了电解铝厂生产过程中产生的电解槽大修废渣的处理方式,包括对大修渣的产生原因、环境影响、运输方式、渣场场址选择、堆存方式及废渣的回收再利用等作了详细的分析。
补充资料:3010S废泥芯破碎滚筒操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查三角皮带的松紧度与磨损情况,如过紧或磨损严重,应予调整或更换。
3、工作前,检查滚筒入口滑道是否损坏,有无芯骨卡住滚筒。如有损坏或卡住,应及时处理。
4、工作前,先点动试车,然后空运转2-3分钟,并检查传动系统(电动机、联轴节、减速器、三角皮带)、支承圈和支承轮的运动是否平稳,确认一切正常后,方可进行生产。
5、工作中注意进料情况,大中件废坭芯必须用锤击碎,将回用芯骨取出,不准随废坭芯进入滚筒。
6、工作中,经常注意支承大圈和支承轮的运转情况,发现大圈摆动和轮面磨平现象,
应及时找维修人员修理。
7、 工作后,清除被滚筒外壳孔卡住的芯骨铁丝。
2、检查三角皮带的松紧度与磨损情况,如过紧或磨损严重,应予调整或更换。
3、工作前,检查滚筒入口滑道是否损坏,有无芯骨卡住滚筒。如有损坏或卡住,应及时处理。
4、工作前,先点动试车,然后空运转2-3分钟,并检查传动系统(电动机、联轴节、减速器、三角皮带)、支承圈和支承轮的运动是否平稳,确认一切正常后,方可进行生产。
5、工作中注意进料情况,大中件废坭芯必须用锤击碎,将回用芯骨取出,不准随废坭芯进入滚筒。
6、工作中,经常注意支承大圈和支承轮的运转情况,发现大圈摆动和轮面磨平现象,
应及时找维修人员修理。
7、 工作后,清除被滚筒外壳孔卡住的芯骨铁丝。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条