1) block caving with pillar
有底柱分块崩落法
2) sill pillars sublevel caving method
有底柱分段崩落法
3) caving with pillars
有底柱崩落采矿法
1.
Based on analysis of multi row a extrusion blast in caving with pillars,the paper presents the method of brock caving with pillars,which developing works will be reduced by 1~2m,the recovery will be increased by 3%~5%.
在扼要分析了有底柱崩落采矿法 ,一次多排挤压爆破落矿存在问题的基础上 ,介绍了一种分块落矿的有底柱分块崩落采矿法 ,该方法与一次挤压落矿相比采切比可降低 1~ 2m ,,回收率提高 3 %~ 5 %。
4) Block caving with floor pillar system
有底柱阶段崩落法
5) Sublevel caving without sill pillar
无底柱分段崩落法
1.
Although a lot of research on the high-efficient exploitation field of vein gold deposits is carried out in the theoretical research of mining method and production practice of mines, the sublevel caving without sill pillar has been neglected at all times.
虽然在迄今为止的采矿方法理论研究与矿山生产实践中,对岩金矿床高效开采领域进行了许多研究,但一直忽视了无底柱分段崩落法,使这一安全高效采矿方法未能在岩金矿床得到实际应用。
6) sublevel caving
无底柱分段崩落法
1.
Experiments were conducted to investigate the effects of material strength and hole burden on the blast performance of fan-patterned holes in sublevel caving, and to analyze the factors affecting the effective area of blasting.
实验研究了试件强度与抵抗线对无底柱分段崩落法扇形炮孔爆破效果的影响,分析了有效爆破区域出现在孔底部位而不是孔口部位的原因,揭示了扇形炮孔爆破的方向性与顺势破坏效应,据此讨论了炮孔密集系数的合理取值范围以及孔底起爆的适用条件等;应用试验结果改进北氵名河铁矿扇形中深炮孔的装药结构与起爆顺序,试验区大块率从3·0%降低到1·8%·并杜绝了爆破“隔墙”现象的发生
2.
A computer-aided technical management for sublevel caving is established and its structural design, compositions and functions are introduced.
介绍了一种适用于无底柱分段崩落法的计算机辅助技术管理系统的结构设计、系统组成与功能等。
3.
This paper describes the principles of computer stochastic simulation and the computer program used for simulating the process of ore drawing in Sublevel Caving.
本文主要介绍了计算机随机模拟方法的基本原理及模拟无底柱分段崩落法的程序结构,并结合对无底柱分段崩落法矿石回收率影响因素的分析研究介绍了随机模拟方法在放矿研究中的应用情况。