1) ten year application evaluation
10年运行评估
2) operation risk assessment
运行风险评估
1.
Power system operation risk assessment can evaluate the likelihood and severity of contingencies, but it is time-consunming to analyze all possible contingencies in real-time environment.
电网运行风险评估可以综合考虑扰动事件发生的可能性和严重性,其模型复杂、计算量大。
2.
Absence of statistical components\' failure data is a great challenge for power system operation risk assessment.
缺乏历史故障统计数据是电力系统运行风险评估中的突出难题。
3.
A time-varying and condition-based component outage model is needed for operation risk assessment,which should consider the change of weather,aging degree and other operation conditions.
电力系统设备发生故障的可能性是随外部天气条件、老化程度等运行工况变化而变的,因此在运行风险评估中需要采用时变的设备停运模型。
4) operation reliability evaluation
运行可靠性评估
1.
This paper presents the operation reliability evaluation software of transmission system based on sequential MonteCarlo simulation method.
介绍了一种基于时序 Monte- Carlo仿真的输电系统运行可靠性评估软件。
6) operating environment evaluation
运行环境评估
1.
The former two parts of this paper are based on the common theory of operating environment evaluation, expatiate the function, characteristic and main content of operating environment evaluation by introducing the research background, the practical meaning, the aim, content, the method and the survey of the item.
有鉴于此,本文提出了商业项目投资必须进行运行环境评估的观点,并根据现代项目评估与论证的基本原理,遵循项目评估与论证的一般过程,结合“维乐康”超市的具体情况,采用科学的方法,对项目运行环境进行充分、全面的评估和论证,以确定项目开发的可行性。
补充资料:地价评估趋势评估法
地价评估趋势评估法
【地价评估趋势评估法】土地价格在一定的时间内由于受诸多因素影响,呈周期性的波动,但总趋势是上升的,因此,利用一定的数学模型,就可以求算出地价,一般要通过回归分析,找出土地价格与时间变量之间的函数关系,画出地价发展变化趋势图形,然后建立数学模型,进而推算出地价。若以Y代表历年地价,X代表时间,丫代表地价,其关系式为:y‘=a+bx(a、b为常数)。采用这一方法,需以长年积累起来的地价变动资料作为分析依据。地价的时间序列最好在ro年以上。因为时间序列愈长,愈能排除偶然因素和短期因素对趋势值的异常干扰。另外,用地价长期趋势图可比较两个地段地价_L涨的强弱程度,如果长期趋线越陡,则表明该地段地价升值性越强;反之,则表明该地价的升值性越弱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条