1) water filling
水充填
2) filling by high water content material
高水充填
1.
Experimental study on new downward drift mining technology with backfilling by high water content materials;
下向进路高水充填采矿工艺试验研究
3) high rate water pack
高速水充填
1.
After broad investigation,this paper introduces technical principle about circulated gravel pack with non-viscous carrier fluid,high rate water pack and frac-packing for sand-control,each of which can be used in special reservoir.
在广泛调研的基础上,总结了水循环充填、高速水充填、压裂充填三种充填工艺的原理。
4) high water content material
高水充填材料
1.
The strength development and the microstructure of sulpholuminate cement-based material with high water content at 20 ℃ and 5 ℃,and the relationship between the microstructure of high water content material and its strength are studied by XRD and pole structure methods.
研究了20℃和5℃时硫铝酸盐基高水填充材料的强度发展规律及微观结构,通过XRD、孔结构测试等方法研究了高水充填材料的微观结构与强度的关系,并重点研究了亚硝酸钠对高水充填材料水化产物微观结构及强度的影响。
5) mining with filling by highwater content material
高水充填采矿
6) Survey of covered karst area
充水、充填溶洞
补充资料:水力充填
水力充填
hydraulic filling
是使用高浓度水砂和尾砂胶结充填,提高充填材料制备和输送的自动化水平。 (王爵鹤)shUI}f ehongtlon水力充填(hydraulie filling)制备充填材料,用水力从制备站沿管道输送和充填到采空区,充填时,使充填体脱水,并通过排水设施将水排出。 按充填材料和料浆浓度,水力充填分为碎石水力充填、细砂或尾砂水力充填和高浓度细砂或尾砂胶结充填等。 水力充填的基本设施包括砂仓、水泥仓、砂浆制备站、输送管道、采场脱水设施以及井下排水和排泥设施。输送管道和管道水力输送是水力充填最重要的设施和工艺。砂浆在管道中流动的阻力,靠砂浆柱自然压头或砂浆泵产生管道输送压力去克服选择输送管道直径时,需要首先按充填能力、砂浆的浓度和性态算出砂浆的临界流速、合理流速和水力坡度等。这些计算的理论基础是固液两相流体力学。计算结果一般需经实验室验证。常用的管道直径为75一178mm,充填能力约为50一70Om,/h。为了避免堵塞,应使输送管道直径大于充填材料最大粒径的3倍。当最大粒径的充填材料含量超过15%时,管道直径应更大布置管路应遵循水力坡度最小的原则,尽量减少局部阻力。充填体脱水方式有渗透式和溢流式。当10C充填材料渗透系数小于5一7时常常不得不用溢流式脱水。 水力充填由于不需要辅助输送环节而效率高,成本低,自动化程度高;但在使充填体密实和便于接顶方面不如风力充填,在机动灵活性方面不如机械充填,在不污染巷道方面不如重力充填。水力充填的发展方向
说明:补充资料仅用于学习参考,请勿用于其它任何用途。