说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 调车作业
1)  shunting operation
调车作业
1.
Elimination of inverse-order——A new model of shunting operation;
一种新的调车作业原理——“消逆法”
2.
This article analyzes the shunting work of locomotives in Tianjin Sub-administration in recent years and reviews the feasibility of monitoring shunting operation with locomotive monitoring unit.
分析了近年来天津铁路分局机务调车现状;阐述了利用机车监控装置为调车作业实施监控的可行性,从基本思路、遵循的标准和监控模式等方面提出了调车监控的具体方案及解决的难点问题。
3.
On the basis of analyzing the influence factors of shunting operation volume in marshalling station,the algorithm model of shunting operation is established.
在分析编组站调车作业量影响因素的基础上,构建了调车作业算法模型。
2)  shunting work
调车作业
1.
Regarding the current status as well as the problemsexisted in station radio shunting work, the paper conceives the composition,structure and functions of intelligent shunting system.
铁路车站调车作业自动化是实现调度集中的基础,针对目前车站无线调车作业的现状和存在的问题,对智能化调车系统的组成、结构和功能进行了设计。
2.
The core functions of intelligent commanding system for shunting work refer to those essential and key functions that the system should possess, mainly including 3 parts: the generation of shunting trip plan, the optimization of work, and the smoothing function that represents the adjustability of commanding and the adaptability of system.
调车作业智能化指挥系统的核心功能是指系统应具备的本质性关键功能,主要包括钩计划编制功能、作业优化功能,以及体现指挥可调性和系统适应性的柔化功能3个部分。
3)  locomotive shunting operation
机车调车作业
4)  railway shunting operation
铁路调车作业
5)  job-shop scheduling problem
车间作业调度
1.
Grafted genetic algorithm for the job-shop scheduling problem;
解决车间作业调度问题的嫁接遗传算法
2.
MRP disassembly,job-shop scheduling problem and network planning are related together,Newthought solving assembly working procedure time optimization is presented.
将物料需求计划分解、车间作业调度问题求解和网络计划三者从解决实际问题的角度联系起来,为求解装配工序时间优化问题提供了可以借鉴的思路。
3.
This paper focuses on the application of parallel genetic algorithm to a job-shop scheduling problem,and presents specific process after improving the traditional migratory strategy.
研究了并行遗传算法在车间作业调度问题中的应用,通过对传统的迁移策略进行改进,给出了运用该算法求解车间作业调度的具体过程。
6)  job-shop scheduling
车间作业调度
1.
Application of immune particle swarm optimization to job-shop scheduling problem;
免疫粒子群优化算法在车间作业调度中的应用
2.
ERP-based cost optimization model for job-shop scheduling problem;
基于ERP车间作业调度问题的成本优化模型
3.
Job-Shop scheduling with alterable craft based on bilevel genetic algorithms;
工艺路线可变车间作业调度的两级遗传算法
补充资料:架桥作业车


架桥作业车
truck-mounted bridge construction set

iiaqiao zuoyeehe架桥作业车(truek一mounted bridge con-Struction set)由专用车辆载运、主要用于架设就便材料低水桥和水面下桥的成套机械化作业器材。属渡河桥梁器材。通常由数辆分别装载和安装有水上、陆上作业装置的越野车辆组成。适于在流速不大于2米/秒、水深6米以内的江河上进行架桥作业。作业装置有打桩门桥、打桩机、拔桩机、起吊设备、移动式电站、电链锯等,有的还有木材加工机械。水上作业主要用打桩门桥完成。打桩门桥上固定有打桩机、拔桩机和吊杆等,用于打桩、拔桩和运送、吊装冠材及上部结构构件。它一次可同时打植4根桩柱,桩柱间隔可在一定范围内调整。其陆上作业装置(作业车)主要用于构筑桥础和岸边桥跨,并配合打桩门桥,依次吊装桥梁上部结构等。架桥作业车设备齐全,机动性好,作业速度高,可节省兵力,降低劳动强度。在有预制构件的条件下,用它从一岸进行架桥作业,每小时可架设低水桥10~巧纵长米。(贾建勋)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条