说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 深厚围岩(土)
1)  thick surrounding rock(soil)
深厚围岩(土)
2)  layer thickness/shoulder bed
层厚/围岩
3)  deep surrounding rock
深部围岩
4)  thick overburden
深厚表土
1.
The present high pressure experimental research and analysis of undisturbed deep soil indicate that the static earth pressure of thick overburden is considerable different from that of superficial soil.
深部原状土重塑后的高压静止土压力系数的实验研究与分析表明,深厚表土静止土压力系数与浅表土的静止土压力系数有较大差异,深井建设设计与施工技术中应考虑这种土压力的特殊性,以避免可能的工程事故及人财物的重大损失。
2.
Based on the condition of Banji Coal Mine, this paper discusses the selection of shaft sinking techniques through thick overburden, and according to the concerned latest specifications, proposes the designing method of reinforced concrete wall and composite wall with steel plate and concrete in shaft drilling.
就板集矿井实际条件论述了深厚表土井筒施工方法的选择,依据最新的相关规范提出了钻井法施工的钢筋混凝土井壁及钢板混凝土复合井壁的设计计算方法。
3.
This paper summarizes the new freezing technology used in construction of the auxiliary shaft of Longgu Colliery in thick overburden.
本文总结了龙固副井的冻结施工工艺,为巨野煤田以及深厚表土的冻结施工提供了经验和技术保证。
5)  deep alluvium
深厚表土
1.
Development and prospect of research on artificial freezing method of shaft sinking technology in deep alluvium;
深厚表土层人工冻结法凿井技术研究进展
2.
In view of the background that our country will construct large-scale collieries in deep alluvium area, the key technologies which required in the freezing process to be used in the deep shaft are research of the basic theory of frozen soil for deep alluvium,designs of freeze wall and shaft lining structure that suitable for the deep alluvium,and the construction technology of freezin.
针对我国今后将要在深厚表土地区建设大型煤矿的工程背景,提出了冻结法建设煤矿深立井需要解决的关键问题是深土冻土的基础理论研究、适用于深厚表土层的冻结壁设计、井壁结构设计以及深井冻结法施工技术。
3.
The aims of this paper is to solve the problems of sedimentation of deep alluvium because of water loss and longitudinal compression failure in composite shaft lining, and then equicohesively repair it.
深厚表土层冻结双层井壁因表土失水沉降,井壁纵向压缩破坏,等强修复井壁,按沉降规律计算最终表土层沉降值选择卸压槽尺寸。
6)  thick alluvium
深厚表土
1.
The new freezing technology and the new freezing design method used in construction of the auxiliary shaft of Longgu Colliery that its freezing deepness is the first exceed 600 m in thick alluvium.
龙同副井是我国目前第一个冻结深度超过600m的深厚表土冻结井。
2.
According to the characteristic of Liangbaosi mine, the author summarized experiences and methods to operate and construct by freezing the thick alluvium, also discussed the methods to freeze the thick alluvium (600m) and construct.
根据梁宝寺的矿井情况,以及对该矿区主井、副井、风井的冻结运转及施工经验教训进行的深入探讨,提出了有效地对600m深厚表土冻结及施工方法,取得了很好的效果。
补充资料:地下洞室围岩(土)稳定性(dixia dongshi weiyan
      地下洞室周围岩、土体的稳定程度。地下洞室的开挖,会引起初始应力的释放,洞室周围岩、土体中产生应力集中和新的变形。应力低、变形小的洞室可以在不支护条件下长期使用。应力高、变形较大的,往往引起岩、土体破坏,因而必须利用支护或加固岩、土体的措施,才能保持使用洞室所必需的断面尺寸。在应力大、变形严重的情况下,不仅会造成洞室周围岩、土体的破坏,而且还可能导致地表沉陷,危及地面建筑物的安全。
  
  根据洞室所在地层的性质,地下洞室分为土洞和岩洞两大类。土体和岩体的工程性质差别较大,两类洞室的变形破坏型式、影响因素,以及稳定性评价方法等,均有所不同。
  
  与大部分岩洞相比较,土洞的稳定性要低得多。一般来说,土洞如果不给予支护,通常都不能保持长期稳定。影响土洞稳定性的因素,主要是土层类型、地下水的状态、洞室断面尺寸、形态以及埋深等。在坚硬和较坚硬的土层中,洞室稳定性较好;在淤泥层、沙层、粘性土层及遇水软化的粘土岩、膨胀土层中,洞室稳定性很差,常常给施工带来巨大困难。土洞的稳定性和土压力的评价,通常采用土力学的分析方法进行。
  
  岩洞的稳定性主要取决于岩体中的初始应力状态、岩体质量(主要是岩体结构和岩块质量)、地下水状况、洞室的断面尺寸、形状及其埋深等。初始应力不高,水平初始应力与铅直初始应力的数值越接近,岩体质量越好。地下水越不发育,洞室断面尺寸越小,洞室围岩的稳定性就越好。反之,当初始应力很高时,岩洞稳定性很差,常使围岩发生板裂、剥落和岩爆,甚至导致洞室完全封闭。岩体结构不良时,围岩可能发生块体崩塌、滑移和弯折破坏;洞室通过含水的泥质岩体、云母质岩体、含有断层泥的破碎带,以及膨胀岩体时,围岩可能发生挤入和膨胀破坏;洞室通过位于地下水位以下的断层破碎带时,饱水的岩屑将可能象浆液一样流入洞室,充填洞室;当地下水非常丰富、水压力非常大时,甚至在坚硬岩体中,也可能使洞室顶板、底板、洞壁或掌子面围岩发生水压突破破坏。
  
  岩洞稳定性的评价,一般采用以下3类方法:①围岩分类评价法。这是普遍采用的一种方法,它是以岩体质量评价为基础,结合已建工程的实践经验进行的。②连续介质力学分析法。利用弹性理论、弹塑性理论以及各种数值分析方法,评价围岩的稳定性。③块体极限平衡分析法。应用极限平衡理论,分析围岩脆性开裂、块体滑移以及层状岩体弯折等问题。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条