1) pipe blockage
堵管
1.
Theoretical analysis and countermeasure study on pipe blockage of ash pneumatic transport;
气力输灰系统堵管的分析与对策
2.
Discussion on pipe blockage of pump ready-mixed concrete;
关于泵送商品混凝土堵管问题的探讨
3.
Combined with practical construction in this paper the reasons caused the pipe blockage of concrete transfer pump are introduced.
结合施工实践 ,介绍了混凝土输送泵堵管故障发生的原因 ,对进料口处、分配阀出料口处、管阀等处发生堵管的判断及处理方法作了分析 ,提出了相应的预防措
2) plugging
[英][plʌg] [美][plʌg]
堵管
1.
Effect of plugging on the efficiency of steam generator;
蒸汽发生器堵管对装置功率影响研究
2.
The effect of steam generator s plugging on device efficiency;
蒸汽发生器堵管量对装置工作效率影响研究
3) pipe blocking
堵管
1.
Due to the problems in the construction organization,concrete s workability,concrete construction equipment and working labors,pipe blocking may occur during the pumping of the concrete.
客专隧道衬砌混凝土是按照耐久性混凝土进行配合比设计的,其材料品质、混凝土工作性能和运灌工艺等都有其特殊的地方,由于施工组织、混凝土工作性能、混凝土施工机械配备能力、施工人员操作水平等,也会造成泵送堵管。
2.
It describes respectively the ground, the preparation work of electricity and water, the hardening of grornd, the meterage in preconstruction, the pipe blocking, the cleanup of soil, disposal of protecting pile, the influence of construction machines and other factors.
对长螺旋钻孔管内泵压CFG桩成桩法中的施工效率问题进行了概括总结 ,分别从施工前的场地、通电通水准备、场地硬化、测量放样 ;施工过程中的堵管、清土及保护桩头的处理、施工机械的影响及其他一些因素的影响等方面进行了讨论 ,提出了解决方
3.
In view of pipe blocking question encountered in pouring process corresponding resolving measures are proposed.
介绍了正常情况下混凝土桩的灌注过程,如何进行计算首批灌注混凝土的数量,并提出了如何解决混凝土桩灌注堵管问题,论述了特殊地质条件下超灌量大的混凝土桩的灌注过程和方法,从而保证混凝土桩的施工质量。
4) stopped up pipes
堵管
1.
Analyzing the reasons which cause the stopped up pipes during bored piles construction ,this paper introduces some precaution measures and treatment methods.
分析了钻(冲)孔灌注桩施工中堵管事故的原因,介绍了防止堵管的措施和堵管的处理方法。
2.
Analyzing the reasons which cause the stopped up pipes during bored piles construction,introducing some precaution measures and treatment method
分析了钻孔灌注桩施工中堵管事故的原因 ,介绍了防止堵管的措施和堵管的处理方
5) Clog Pipe
堵管
1.
The Clog Pipe Reasons of Mix-Material to CFG Pile Technology of Long Twist Auger Pump Pressure in Pipe and Precautionary Measures;
长螺旋钻管内泵压CFG桩成桩工艺混合料堵管的原因及预防措施
6) blocking pipe
堵管
1.
Analysis of the 123-C_1 heat exchanger in the short term a number of reasons for the leakage,from maintenance to take corresponding measures,and to develop a reasonable blocking pipe technology,with good results.
分析了123-C_1换热器在短期内多次发生泄漏的原因,从检修方面采取了相应的措施,并制定了合理的堵管工艺,取得良好效果。
2.
In view of the begriming matter and blocking pipes on the Bishiff gas treating system of the 2 200 m3 blast furnace in Liangang,the composition of the begriming matter,the raw material of the blast furnace,the quality of the cleaning water and the load of the system and so on were respectively analyzed.
针对涟钢2200m3高炉比肖夫系统的积垢与堵管,分别从垢物成分、高炉原料、水质、负荷等方面进行了分析。
补充资料:管堵
分子式:
CAS号:
性质:又叫塞头。装在管端内螺纹上,以堵塞管子的管件。
CAS号:
性质:又叫塞头。装在管端内螺纹上,以堵塞管子的管件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条