2) high temperature shift furnace
高温变换炉
1.
The wall thickness of high temperature shift furnace cylinder amounts to 85 mm, equipment material is imported A204 GR B FBQ.
高温变换炉筒体壁厚达85mm,设备材质为A204GRBFBQ,属国外材质,通过分析筒体接管裂纹产生的原因和低合金耐热钢的焊接性,制定修复方案和焊接工艺,实际验证修复质量合格。
4) high-temperature water-gas shift reaction
高温水煤气变换
1.
Development of monolithic catalysts for high-temperature water-gas shift reaction;
整体式高温水煤气变换催化剂的初步研制
5) high temperature shift catalyst
高温变换催化剂
1.
Study on surface fractal dimensions of several high temperature shift catalysts by N_2 adsorption method
用氮气吸附法研究高温变换催化剂表面分形维数
2.
The tortuosity factors of LB energy-saving high temperature shift catalyst are measured under ambient pressure at 40 ℃ and 60 ℃,respectively.
采用改进的Wicke-Kallenbach扩散池,用稳态法在常压40℃和60℃下测定了LB型节能高温变换催化剂曲节因子和气体有效扩散系数,测定中各实验点氮气与二氧化碳的摩尔通量之比符合G raham理论,与理论值误差在5。
3.
The key influential factors on activities of LB energy-saving high temperature shift catalyst were regarded as characteristic input vectors,and activities of catalysts as output vectors.
将影响低汽气比条件下LB型节能高温变换催化剂活性的主要因素作为人工神经网络的特征输入向量,将全部实验数据分为训练集和预测集,运用Matlab神经网络工具箱,按改进的Bayes自动归一化算法建立反向传播神经网络模型,不仅可防止网络陷入局部最小,而且提高了网络训练精度和泛化能力。
6) HTS catalyst
高温变换催化剂
1.
Manufacture of B113 HTS catalyst by washing with ambient temperature water instead of boiling water;
通过实验室和工厂试验证明,采用常温水或40℃以下水替代沸水洗涤料浆生产 B113 型高温变换催化剂的工艺是可行的。
补充资料:Radon变换和逆Radon变换
Radon变换和逆Radon变换
X线物理学术语。CT重建图像成像的主要理论依据之一。1917年澳大利亚数学家Radon首先论证了通过物体某一平面的投影重建物体该平面两维空间分布的公式。他的公式要求获得沿该平面所有可能的直线的全部投影(无限集合)。所获得的投影集称为Radon变换。由Radon变换进行重建图像的操作则称为逆Radon变换。Radon变换和逆Radon变换对CT成像的意义在于,它从数学原理上证实了通过物体某一断层层面“沿直线衰减分布的投影”重建该层面单位体积,即体素的线性衰减系数两维空间分布的可能性。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条