说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 中镀后拉
1)  drawing after medium galvanizing by dipping
中镀后拉
1.
The process of drawing after medium galvanizing by dipping is a drawing method adding bright steel wire drawing between heat treatment and galvanizing by dipping.
中镀后拉工艺是在先镀后拉工艺的热处理和热镀锌之间插入光面钢丝拉拔。
2)  galvanizing first and drawing afterwards
先镀后拉
1.
This paper compares the corrosion behaviors and microstructures of the galvanizing first and drawing afterwards and those of the drawing first and galvanizing afterwards hotdip zinc coating of the steel wire by sea water simulated test and SEM and EDS.
采用海水模拟试验比较了先镀后拉和先拉后镀热镀锌钢丝的耐蚀性,利用扫描电镜和能谱仪对镀层微观组织和成分进行分析,结果表明,先镀后拉钢丝镀层由表及里是三层组织,既致密的η相、ζ相和δ1相,先拉后镀钢丝镀层也由η相、ζ相和δ1相组成,但ζ相呈分散状。
3)  drawing first and galvanizing afterwards
先拉后镀
1.
This paper compares the corrosion behaviors and microstructures of the galvanizing first and drawing afterwards and those of the drawing first and galvanizing afterwards hotdip zinc coating of the steel wire by sea water simulated test and SEM and EDS.
采用海水模拟试验比较了先镀后拉和先拉后镀热镀锌钢丝的耐蚀性,利用扫描电镜和能谱仪对镀层微观组织和成分进行分析,结果表明,先镀后拉钢丝镀层由表及里是三层组织,既致密的η相、ζ相和δ1相,先拉后镀钢丝镀层也由η相、ζ相和δ1相组成,但ζ相呈分散状。
4)  chromium plated handle
镀铬拉手
5)  dip coatings
提拉镀膜
6)  coated first and then drawn
先镀后拔
补充资料:哈拉布拉二中

学 校 简 介

哈拉布拉二中属九年制乡级中学,学校占地面积为22459平方米,校舍建筑面积为1457平方米。哈拉布拉二中校园环境优雅,教学设施基本齐全,现有教职员工87人,开设教学班32个,有在校生1507人。

学校以“责任、荣誉”为校训,以“尊师爱生、严教勤学、求实创新、力争一流”为校风。学校在长期的办学实践中,坚持德、智、体、美、劳全面发展的教育方针,面向社会,面向高中为在校生打下良好的基础。学校自1981年合校开始,现已培养出合格初中毕业生1636人,学校还先后被新源县委、政府授予先进党组织,校园建设先进学校,被伊犁哈萨克自治州教育局授予勤工俭学先进单位等多种荣誉称号。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条