说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 环芯
1)  ring core
环芯
1.
Optimal selection of process parameters of collector ring core;
一种汇流环环芯加工工艺参数的优化选择
2)  annular coring
环状取芯
1.
The paper proposed a set of drilling tools of large diameter hard rock annular coring with low energy consumption,low cost and high efficiency based on analyzing on the methods of large diameter hard rock coring in domestic and foreign.
在分析了国内外大直径基岩孔钻进取芯方法的基础上,提出了一套低能耗、高效率、低造价的大直径硬岩环状取芯钻具,设计制作了样机,并进行了样机试验。
3)  o ring belt
环形带芯
4)  Trephine cord
环锯锯芯
5)  toroidal core
环形磁芯
1.
The novel non-contact type current sensor based on giant magneto-impedance (GMI) effect in Co-based amorphous ribbon toroidal core was studied.
利用钴基非晶薄带环形磁芯的巨磁阻抗效应研制了新型非接触电流传感器。
2.
7)Si_(12)B_(18) amorphous toroidal core annealed with 25 A/mm~2 pulse current density under a transverse magnetic field of 2 kA/m for 30 s is presented.
7Si12B18非晶薄带卷制成环形磁芯,在2 kA/m横向磁场作用下,用密度为25 A/mm2的脉冲电流退火30 s后作为敏感元件,提出了一种利用巨磁阻抗效应制作的新型非接触弱电流传感器。
6)  Ring structure iron core
环型铁芯
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条