2) installation weld
安装焊缝
1.
Comparing test measurements and FE calculation, the affects of factors, such as size and arrangement of heating device, material and specifications of main tube, multi-tube heating, additional main tube heating, to stub tube installation weld heat treatment temperature field.
通过实验测量和有限元计算,研究了加热装置的大小和布置、主支管的材料和规格、多管加热、主管附加加热等因素对接管座安装焊缝热处理温度场的影响。
4) field welder
安装焊工
5) construction opening
安装开口
6) assembly opening
安装开口,安装洞口
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条