1)  Acceptance testing
验收规则
2)  sampling acceptance rules
抽样验收规则
1.
Discussion on the sampling acceptance rules for setting refractory product;
浅谈定形耐火制品抽样验收规则
3)  Check
验收
1.
Installation and check of the atom fluorescence spectrum;
SK-2003Z型原子荧光光度计的安装与验收
2.
About installation and checking of large medical equipments;
浅谈大型医疗设备安装与验收工作的组织
3.
This paper mainly introduces several aspects of management of medical equipments in our hospital such as purchase, check in,use,maintenance,metrology and scrapping.
主要阐述了我院医疗设备管理过程中的采购、验收、使用、保养、维护、计量直至最后报废各环节的做法。
4)  acceptance
验收
1.
Studying on quality of the pig iron for steelmaking to be check before acceptance;
外购炼钢生铁的质量验收的实践
2.
The normative acceptance of medical equipment;
医疗设备的规范验收管理
3.
Construction of rural water supply project and quality acceptance;
农村供水工程施工及质量验收
5)  check and accept
验收
1.
For automotive brake system ductile casting QT450-12,in case of ensure mechanical property,internal and external automotive casting provider have greater discrepancy in casting microstructure and composition at check and accept that,most of internal company only concerned the pearlite content,but aboard company more concerned graphite form.
对于汽车用铸态制动类球墨铸铁QT450-10铸件,在保证力学性能符合要求的前提下,国内外汽车铸造厂商对铸件组织和成分的验收存在明显的差异,国内企业强调铸件珠光体含量的验收指标,国外企业更重视铸件石墨组织的验收。
2.
Some existing problems are pointed out during on-spot monitoring for check and accept of completed project.
针对建设项目竣工环境保护验收监测中存在的一些疑难问题,分别从废水监测中采样点位的确定和描述及采样时间的确定、清污合总排口的情况下监测点位的确定;厂界噪声监测中测点的选择、背景值的修正与测量、环境敏感点的监测;废气监测中无组织废气监控点的布设、有组织废气采样方法的选择、燃烧性废气监测中过剩系数的影响;验收监测期间的生产工况的确定等方面进行了探讨,提出了一些解决办法。
3.
Following article mainly discuss some basic principles of how to choose ,check and accept the sampling machine for coal flow sampling.
主要论述了在煤流中采样使用的采样机的选择和验收中的一些基本的原则。
6)  acceptance check
验收
1.
The necessity of acceptance check of CNC machine tool is introduced,the procedure of acceptance check and problems that should be paid attention is described.
介绍了数控机床验收的必要性,对验收过程和应注意的问题进行了阐述。
2.
The procedure and content of acceptance check for chemical engineering construction project are introduced systematically.
结合作者的实际工作 ,总结了对工程建设实施“三道质量控制工序”的经验 ,强调了过程质量控制的重要性 ,较为系统地介绍了化工建设项目预验收工作的程序和内
3.
As the final step of the execution of the equipment purchase contract, acceptance check is very important for proper operation of the equipment.
为确保新购医疗设备能正常地、安全地运行,验收工作是十分重要的,它是装备购置合同执行中的最后一个环节。
参考词条
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。