1)  Steel chimney
钢烟囱
1.
Discuss on construction organization innovation from the installation process of steel chimney;
钢烟囱安装过程论施工组织创新
2.
Overall hoisting course include reader of 237 t and steel chimney of 60 m.
介绍了在金陵石化炼油厂200万t/a柴油加氢装置建设中,将质量为237t的反应器和高60m的钢烟囱成功进行整体吊装过程中的关键技术。
2)  prevention of corrosion in steel chimney
钢烟囱防腐
3)  towering steel stacks
高耸钢烟囱
4)  reinforced concrete chimney
钢筋砼烟囱
1.
The demolition of a 100 m-high reinforced concrete chimney by directional blasting was introduced,the blasting cut position,blasting cut shape and symmetrical direction windows was studied.
以定向爆破拆除100m高钢筋砼烟囱为工程实例,论述了烟囱爆破要合理地确定爆破切口部位、选择爆破切口形状和精确地开设对称定向窗等工程经验。
5)  inner steel cylinder chimney
钢内筒烟囱
1.
Structural design of suspensory inner steel cylinder chimney of fossil-fired power plants;
火力发电厂悬吊式钢内筒烟囱的结构设计
6)  guyed steel stack
牵索钢烟囱
补充资料:钢烟囱安装


钢烟囱安装
steel stack setting

  法施工。吊装前,在地面设置组装台架,在台架上将烟囱拼装组对成整体,用门形或人字形桅杆起重机,或者用大型履带式起重机、汽车式起重机将烟囱整体吊起、就位、固定。 液压顶升倒装法对于有塔式框架结构、且高度在100m以上的超高大型钢烟囱,采用大型起重机(如3000kN的吊机)也不能胜任整个烟囱的吊装时,可采用液压顶升倒装法。液压顶升倒装法的几个主要步骤有:顶升施工,塔式框架安装,烟囱焊接和安装测量。 顶升施工其主要步骤如下:(l)在烟囱安装位置上设立4~6台同一型号、总顶升力约为整根烟囱重量1.5倍以上的小液压千斤顶,并将其与高压油泵站用管路并联连接,使其既能同步操作又能单体工作,以支承并调整所安筒段的高度及筒体垂直度。(2)在小液压千斤顶上设置一工作平台,在平台上划出烟囱的安装位置,用起重机按正装法将烟囱顶部筒体和筒帽安装好。筒体的高度由烟囱总体施工方案确定。(3)在已安装好的烟囱外周,设立三根经计算能充分满足顶升需要的顶升支柱,在每根支柱上各设置一台顶升力约为烟囱总重量。.5倍以上的大液压千斤顶及其附属设备,并用管路将其与高压油泵并联连接,使其既能同步操作又能单体工作。(4)在该段烟囱下口内侧约50omm处设置可移式内环梁,外侧设置可移式外环梁,当内环梁向外扩胀、外环梁向内收缩时,即可将筒体箍紧。在外环梁上还设置三个吊装孔板,并与三根顶升支柱对正。(5)顶升开始时,启动高压油泵,使筒体下的小液压千斤顶同步顶升,借以调整该段筒体高度,并使外环梁上的吊装孔与提升拉条上销孔对准,插入1号销并固定好,此时将设于顶升支柱上的三台大液压千斤顶上部的2号销插入拉条孔并固定好。同步启动三台大液压千斤顶,带动提升拉条及外环梁抱紧的烟囱筒体上升。当三台大液压千斤顶顶升了一个行程时,将3号定位销插入拉条孔中,使烟囱的重量通过3号销传给顶升支柱。当大液压千斤顶退回到零位后,拔出2号销,向下移一个孔距,继续启动三台大液压千斤顶,开始第二个行程的顶升工作。当第二个行程顶升开始后,将3号销拔出,待该行程顶完后使用。(6)当烟囱安装段经过几个行程的顶升并达到预定高度后,用电瓶车将组装好的下一筒体单元运至顶升段下面,用六台小液压千斤顶顶住,退出电瓶车后,启动小液压千斤顶,使之与上部烟囱筒体对口、焊接固定、涂装,然后继续微升六台小液压千斤顶,使安装部分的整个筒体重量全部由小液压千斤顶承接。