1) shut-in time for pressure survey
关井测压时间
1.
Calculating method of shut-in time for pressure survey in production wells in low permeability oil reservoirs and its application;
低渗透油藏生产井关井测压时间的计算与应用
2) well shut in test period
关井时间
3) shut-in pressure measuring
关井测压
4) logging time
测井时间
1.
The main factors includes tool eccentricity,logging time,casing type,formation lithology and mud ingredients,etc.
分析了利用声幅及声幅变密度测井评价固井质量的主要影响因素:仪器偏心、测井时间、套管型号、地层岩性、水泥浆配方等。
5) open-shut in time
开关井时间
1.
It is very important for taking all and exactly production test data of testing open-shut in time logically.
合理的测试开关井时间对取全取准试油资料至关重要。
6) well downtime
油井关井时间
补充资料:无弹性架压磁测力传感器压头
无弹性架压磁测力传感器压头
无弹性架压碰测力传感器压头
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条