|
说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
|
|
1) temperature at stopping pump
停泵井温
2) termination of pumping
停泵
3) well pump
井泵
1.
To reduce the cost of wall pump producing,the type and basic parameters of a new series of well pumps were put-forward.
为了降低井泵的生产成本,提出了一个新型系列井泵的型式与基本参数,在结构上采用拉杆把一台泵的所有泵体同时联结起来的形式,代替QJ型系列井用潜水泵和JC型系列长轴深井泵的每个泵体之间分别用螺栓固定联结的型式,同时加大了叶轮直径;在性能指标方面,新型系列井泵的单级扬程比相同井径、相同流量规格的QJ型系列和JC型系列井泵的单级扬程高50%以上,水泵效率高于三个相关标准《井用潜水泵》、《长轴离心深井泵效率》和《离心泵效率》规定的指标。
4) gradient of stopping pump
停泵梯度
5) pump-stopping water hammer
停泵水锤
1.
In light of the harm of water hammer in building water-supply system,the author introduces the causes of water hammer,analyzes the theoretical calculation of water hammer s pressure changing value,and proposes the measures should be adopted to avoid the damage from pump-stopping water hammer,in order to increase safe reliability of water hammer protection functions of building water-supply system.
针对建筑给水系统的水锤危害,介绍了水锤现象产生的原因,分析了水锤增压值的理论计算,提出了避免停泵水锤危害应采取的措施,以提高建筑给水系统水锤防护功能的安全可靠性。
6) pumping accident
事故停泵
1.
Effect of water hammer to pressure pipes for pumping accidents;
事故停泵水锤对压力管道的影响
补充资料:温井坝
温井坝 Nukuyi Dam 概 述 温井坝位于日本广岛县山县郡加计町、太田川(Otagawa)支流大山川上。抛物线型混凝土拱坝,最大坝高156m,总库容0.82亿m3。电站装机容量0.23万kW。主要目的为防洪、维持河流最小流量、城市供水和发电。1974年实施调查,1977年动工,1985年完工。 坝址河谷狭窄,两岸岸坡达45°~60°,宽度只有40~60m。表土和覆盖层浅薄,有整体岩基出露。基岩为中生代白垩纪末期的广岛花岗岩,由中、粗粒黑云母花岗岩、细粒黑云母花岗岩、斑状黑云母花岗岩构成。岩性坚硬,但也有较多小规模的软弱层。 坝址集水面积253km2,有效库容0.79亿m3,死库容300万m3。校核洪水位383.5m,设计洪水位381.0m,正常蓄水位360.0m,最低水位289.0m。 枢纽包括大坝、溢洪道及引水设施。 大坝为不对称抛物线拱坝,坝顶高程385.0m,坝底基岩高程230.0m,坝顶长382.0m,顶部厚度为8m,底部33m,坝体积为80万m3。通过试载法、有限元分析和模型试验测得坝体最大压应力为6.5MPa。 在高程280m设4个泄水孔,作为正常泄洪用。在大坝顶部设有非常溢洪道,堰顶高程377m,分成5孔,在高程320m设有2个中孔,在高程259m设有1个底孔,作为向下游河道放水和放空水库用。 主体工程于1991年7月动工,1993年底开始坝体混凝土浇筑,采用柱状块浇筑法施工,1996年12月坝体浇筑完毕。 在高边坡开挖中,采用了预裂爆破方法,以限制爆破对岩石的影响,并根据节理走向和倾角设置岩石锚杆和预应力锚杆,加固边坡。设置了许多变形监测仪器,对边坡稳定性进行动态监测。 由于温井坝为混凝土拱坝,为获得高强度的混凝土,进行了高性能减水剂试验以及砂和骨料粒形改善试验。结果表明:粒形改善后,可以减少单位用水量,提高混凝土抗压强度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
|