1)  gap height
缝高
1.
The key problem of the fracture to thin layer is how to control gap height on which many factors influence.
薄层压裂的关键问题是如何控制缝高 ,而对缝高的影响因素较多 ,通过软件模拟和国内外文献资料及实验数据 ,证实薄层压裂缝高的主要影响因素为粘度和排量。
2)  fracture height
裂缝高度
1.
Impact of earth stress on vertical fracture height and technique of fracture height control;
地应力对垂直裂缝高度的影响及缝高控制技术研究
2.
We consider that it's necessary for Yulin gasfield to carry out a fracturing design to control fracture height based on an analysis on operation and production data.
通过对榆林气田施工生产资料的分析,认为榆林气田有必要进行控制裂缝高度压裂设计。
3.
Artificial barriers is widely used in order to control hydraulically fracture height propagation in reservoir with worse barrier zone,especial thin pay-zone.
对于遮挡层(隔层)较差的储层(尤其对于薄层储层)压裂,广泛应用人工隔层技术有效控制压裂裂缝高度。
3)  fracture height control
缝高控制
1.
Impact of earth stress on vertical fracture height and technique of fracture height control;
地应力对垂直裂缝高度的影响及缝高控制技术研究
4)  Fracture height containment
控制缝高
5)  crack height
缝高分析
6)  hydraulic fracture height
水力缝高
参考词条
补充资料:冲击高电压测量(见高电压测量)


冲击高电压测量(见高电压测量)
measurement of high impulse voltages

  ch。门引才g。。dion丫日cel}o口g冲击高电压测量(rneasurement ofhighimpulsevoltages)见高电压测量。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。