1) the Fuzzy Priority Theory
模糊优先理论
1.
Applying the Fuzzy Priority Theory to choose the optimal program of mine design;
模糊优先理论在矿井设计方案选择中的应用
2) fuzzy preference theory
模糊优先权理论
4) Fuzzy Optimum theory
模糊优化理论
1.
This paper recommends a Fuzzy Optimum theory model,which suits the optimization of diamond bits and it has been applied to the optimization of wireline diamond coring bits in a gold mine of Jiaodong, Shan-dong province.
本文介绍了一种适用于金刚石钻头优选的模糊优化理论模型,并将其应用于胶东某金矿金刚石绳索取心钻头的优选。
5) fuzzy optimum selection theory
模糊优选理论
1.
Combined wih the fuzzy optimum selection theory,the pseudo multi-objective genetic algorithm based on fuzzy optimum selection theory is proposed in this paper,which is used to detect the structural damage magnitude using static strain.
将模糊优选理论与多目标遗传算法相结合,提出了基于模糊优选理论的伪多目标遗传算法,解决了结构多损伤中传统遗传算法对载荷不敏感部位识别难、精度不高、运算效率低的不足,并将该方法应用于两端固支梁的损伤程度识别中。
2.
A three-layer forward neural network construction is built in the paper, combining the fuzzy optimum selection theory with the neural network.
建立了一个三层前向式神经网络结构 ,将模糊优选理论与神经网络理论相结合 ,通过改进的BP算法对网络进行训练 ,并把该网络用于对水利投资项目的评价 。
6) fuzzy optimization theory
模糊优选理论
1.
Seepage prevention type of earth-rock dam permeable foundation selected by fuzzy optimization theory;
用模糊优选理论优选土石坝透水坝基防渗类型
2.
Application of GIS and fuzzy optimization theory to location of tailings dam
GIS及模糊优选理论在尾矿坝选址中的应用
3.
In order to improve the defects of current selection of highway tunnel structure pattern,the optimization model of highway tunnel structure pattern is established by fuzzy optimization theory and analytic hierarchy process(AHP) according to different levels and sorts of factors which mainly affect the structure pattern selection of highway tunnel.
针对现行选择高速公路隧道结构型式方法上的不足,遴选影响高速公路隧道结构型式选择的主要因素,根据因素的不同层次与类别,借鉴层次分析法,运用模糊优选理论建立并求解高速公路隧道结构型式优选模型,根据模型计算结果确定最优方案,结合实例介绍该方法的具体运用。
补充资料:优先承租权与优先购买权
优先承租权与优先购买权:出租人在根据城市规划和建设需要改建、翻建出租的房屋时,承租人应当予以协助(如按时搬迁),出租人将改建、翻建后的房屋出租时,原承租人有优先承租的权利。出租人在出卖已出租的房屋时,承租人有优先购买权,得按照规定的条件购买现住房。《民法》魏振瀛,第一版,第481页,北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条