1)  welding material expenditure
焊接材料消耗
1.
A calculation method of welding material expenditure in production was described in this paper,which is applied to increasing the economic benefits of an enterprise and promoting the development of welding technology.
本文主要阐述了产品焊接材料消耗定额的计算方法 ,并通过对其进行研究 ,其更深远的意义是 ,提高企业经济效益 ,促进焊接技术发
2)  welding consumables quota
焊接材料消耗定额
3)  welding consumable
焊接耗材
4)  consumables [英][kən'sju:məbl]  [美][kən'suməbḷ]
消耗性材料(常指焊条)
5)  material consumption
材料消耗
1.
This article has described the function and establishment method of the material consumption process ration,and the effect of the blank material selection on the ratio has been illustrated as well.
介绍了材料消耗工艺定额的作用和制定方法,并举例说明了毛坯选择对材料消耗工艺定额的影响。
2.
By comparison of the inner pressure and the material consumption between the understructure of the silo with an intermediate post and that without,a new understructure of the silo was offered,which bore the advantages of resonable pressure distributions,minimum material consumption,low cost and easy construction.
本文介绍并分析了带内柱的筒下层结构,将该种结构与不带内柱的筒下层结构进行了内力及材料消耗等方面的比较。
3.
In order to decrease material consumption and to increase the ratio of performance to price of the products,the diesel engine of the Model 2110A,which is come of the Model 2105A,is developed.
为了降低原材料消耗、提高产品的性价比,对原2105A型柴油机进行改进,开发出新的2110A型柴油机样机,其中3台样机在有关检测单位按JB/T 9773。
6)  Consumable Materials
消耗材料
1.
Buying large amount experiment consumable materials in public bidding way can not only prevent from corruption, but also develop the biggest benefit of investment efficiently.
大宗实验消耗材料招标采购,既能防止腐败现象发生,又能有效发挥投资的最大效益。
补充资料:施工企业材料消耗定额


施工企业材料消耗定额
quota of material consumption in construction enterprise

shigong qiye eailiao xiaohao dinge施工企业材料消耗定颊(quota of materia-eonsumPtion in eonstruetion enterPrise)在一定条件下,施工企业完成单位工作量合理消耗材料的数量标准。它由有效消耗、施工损耗和管理损耗三部分构成。(1)有效消耗指构成工程实体的净用量;(2)施工损耗指施工过程中操作、下料的损耗;(3)管理损耗指在运输、保管过程中的损耗。 材料消耗定额分预算、施工和概算材料消耗定额三种。(1)材料消耗预算定额。在确定一个计量单位的分项工程基础上,由有效消耗、施工损耗和管理损耗组成。(2)材料消耗施工定额。在确定一个计量单位的分项工程基础上,由有效消耗和施工损耗组成。(3)材料消耗概算定额。根据历年来同类工程结构材料消耗量的统计资料,经整理分析而制定的经验型综合定额。 (刘和卿)