1) workshop arrangement
厂房配置
2) arrangement of powerhouse
厂房布置
1.
Analysis of the factors that affect the arrangement of powerhouse of pumped storage power station
抽水蓄能电站厂房布置的影响因素分析
3) workshop and equipment
厂房和装置
4) main power block configuration
主厂房布置
1.
Based on optimized design of main power block configuration and structural sizes for Datang Xinyang 2×600 MW USC units project,phase II,the paper analyzes and compares the affects of different arrangement schemes on the primary investment,operation and maintenance.
通过对大唐信阳二期2×600 MW级超超临界机组工程主厂房布置格局、结构尺寸的优化设计,分析比较了不同布置方案对初投资、运行维护的影响。
5) kitchen allocation
厨房配置
6) prefabricated industrial plant building
装配式工业厂房
1.
Application of value engineering to hoisting schemes of prefabricated industrial plant building;
价值工程在装配式工业厂房吊装中的应用
补充资料:安装钢结构厂房钢柱
安装钢结构厂房钢柱
巍 安装钢结构厂房钢柱
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条