说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 顶管
1)  pipe jacking
顶管
1.
Calculation method of ground deformation induced by pipe jacking construction;
顶管施工引起地表变形的计算方法
2.
Discussion on construction scheme of pipe jacking for a water diversion pipe;
某引水管顶管法施工方案探讨
3.
Reaction distribution investigation and structural analysis of composite thrust wall of rectangular pipe jacking shaft;
顶管矩形工作井复合式后背墙反力分布研究
2)  pipe-jacking
顶管
1.
Preventing and settling methods of various holdbacks in pipe-jacking construction;
顶管施工过程中各种障碍的预防与解决办法
2.
Discussion on theoretical formulae of lateral friction resistance for pipe-jacking;
顶管侧摩阻力理论公式的探讨
3.
Steady Promotion of RPM Pipe-jacking Technology in Our Country;
稳步推广我国玻璃钢夹砂管顶管技术
3)  pipejacking
顶管
1.
Stress and deformation analysis of pipejacking thrust wall;
顶管工程后背受力与变形三维分析
2.
In connection with engineering practice in a project in Lianyungang, such as determination of workmanship, selection of pipes and the way of building the working shaft, an initial study is made on pipejacking of the sewer in soft ground, including specific calculation of the jacking force in the sewer design and workmanship of piping.
结合连云港市一工程的实际情况,对软土地基污水管道顶管工程作了初步分析。
3.
With the practical application of pipejacking the said pipe in Shanghai Fengting Water Clarification Works and pipe networks, the engineering benefit is studied while the factors and problems arising from such application are taken into consideration for reference to similar works.
通过在上海市枫亭水质净化厂及管网工程中进行玻璃钢夹砂顶管的应用实际,分析了采用这一技术的工程效益并探讨应用玻璃钢夹砂管顶管需要考虑的各种因素和存在的问题,为在类似工程中的应用提供借鉴。
4)  jacking pipe
顶管
1.
This paper introduces the principle of NPD-A1500 jacking pipe machine with balance of slurry and water,clarifies the engineering methods and quality control measures of NPD-A1500 jacking pipe machine with balance of slurry and water,and proposes the problems in the process of engineering.
简要介绍了NPD-A 1500泥水平衡顶管机的工作原理,阐述了采用NPD-A 1500泥水平衡顶管机进行顶管施工的方法与质量控制措施,同时提出了施工过程中应注意的问题。
2.
This paper introduces the theory of jacking pipe technology with balance of soil and water.
介绍泥水平衡顶管工作原理,根据工程实践,针对该技术的特点提出相应的施工方法和应注意的问题。
3.
Based on the construction practice of a 500mm-diametered jacking pipe in Tailand Beilan Sewage Treatment Bid SC-23, this paper gives an introduction to the bias crushing circulation muddy water balanced pipe jacking equipment, muddy water circulation flow, as well as the construction technology and characteristics.
根据泰国北榄污水处理SC - 2 3标直径为 5 0 0mm顶管的施工实践 ,对所用的偏压破碎型环流式泥水平衡顶管设备、泥水循环流程、施工技术及特点作一介绍。
5)  top pipe
顶管
1.
This paper mainly expounds problems paid attention to in plaster balance top pipe construction technology.
文章对泥水平衡法顶管施工工艺中应该注意的几个问题作了主要阐述。
2.
The paper introduced the construction technology of top pipe methods for road drainage pipeline,and proposed some problems and treatment methods in the construction.
介绍了在城市道路排水管道施工时,因埋深较大,地下水位高于设计排水管顶情况下,采用的顶管法施工技术,以及在顶管施工中出现的问题和处理方法。
3.
Combining with the practical experience of top pipe construction of drainage works in Xingkaipu section of the highway, this paper concludes the technological plan of top pipe construction of drainage pipeline through the railway and its point of quality control.
结合长沙市新开铺路段排水工程顶管施工的实践经验,总结了穿越铁路顶管施工的技术方案和质量控制要点。
6)  push pipe
顶管
1.
The application of the hydraulic push pipe technology in underground pipe construction was introduced.
介绍了液压顶管技术在地下管道施工中的应用,阐述了该技术的关键要求、施工要领以及验收规范,为更好的进行管道工程施工提出了见解。
2.
As social progress and development of urban construction, the advance of the gullet drain s diffusion rate and reform of the older section of a city, push pipe construction are more and more dissemination already.
随着社会的进步和城市建设的发展,下水道普及率的提高及旧城区的改造,顶管施工已经越来越普及。
3.
Non-excavation technology such as push pipe was presented.
阐述了顶管等非开挖技术,重点介绍了泥水平衡法顶管流程,计算了顶管阻力,提出了顶管施工在电缆敷设路由中需要注意的事项。
补充资料:顶管


顶管
pipe jacking

d ingguon顶管(pipe jaeking)将需埋设的地下管道在工作坑内直接顶入土层中的暗挖式施工方法。可用于工技术的发展。美国在不用中继接力环的情况下顶进在软土地区施工地下管道穿越铁路、公路、湖泊河流及距离达到588m,德国在使用中继接力环的情况下创造建筑物等。顶管按顶进方向木同分为水平顶进和垂直出1210m的长距离顶管记录。上海宝山钢铁总厂3条顶进;按挖土方式不同,分为机械开挖顶进,挤压顶进,直径为3m、长约180m的进水钢管管道采用泥浆套顶水力机械开挖顶进和人工开挖顶进;按顶进长度分为管法施工。1986年上海顶进穿越黄浦江的煤气管道的一般顶管和长距离顶管。一般顶管的顶进距离通常不直径为2.4m、总长694m,是当时国内顶进距离最长超过10om,适用于城市排水工程施工。长距离顶管的的顶管工程。1981年英国研制出蛆叫式顶管新技术,顶进距离长达数百米甚至上千米,一般用于穿越江、日本将遥控技术应用到顶管法中,通过闭路电视和各河、湖、海底部的工程施工。长距离顶管常以中继接力种仪表进行遥控操作。由于顶管施工技术的不断发展,分段顶进。顶管常用的为钢筋混凝土管和钢管。根据工歉,2洲··\一.,:下巍1尸户沪作坑(井)尺寸和起吊设备能毅二qZJ///艺__瘾葵壑蘸夔痊些夔蝗蛋夔邑百命场尹毯尼丝生自魏酬力确定每节管子长度。钢管未可朽趋蓦酬用日翻蕉鑫囊童奎鑫:奎奏羹奎鑫颤冒认燕刃荀套萄襄羹羹葬接头通常在工作坑(井)内焊戮羚鸳到玛粼泳绎二鸯毖本鬓与蛾当祥车J公堤接。钢筋混凝土管接头一般L汾之汾勒瓜晶狱淤.一;汰二‘;公二‘磷漏习采用带有钢外套环的平接式,外套环可以固定在管的顶管施工示意图一端,也可以不固定。接头采1一后座;2一调整垫;3一后座支架;4一千斤顶支架;5一主千斤顶;6一刚性顶铁;7一u形用环形防水密封圈形式。顶顶铁;8一环形顶铁.9一导轨;1。一预埋板;11一管道;12一穿墙止水;13工作井井壁。14-管法施工设备有顶进设备密封圈;巧一中继环;16一中继千斤顶;17一工具管(如千斤顶、后座、顶铁和导轨等)、出土设备(根据挖土方式而定,如吸泥机、切又出现了许多特种顶管方法,例如平列式顶管、垂直顶削盘等)和其他设备(如中继接力环、泥浆配制供给设管,大型箱涵顶进等。备等)。参考书目 顶管施工前开挖工作坑‘井),并在工作坑内做后.、,_矜更牛产大同编,软土地基与地下工程,中国建筑工业__二__.二_‘__乙一_一万、_‘_一_一‘、二丁厂.’’.几一丁’~二一出版社,北京,1984。座(后背)和安设导向设施。工作坑是进行卸管、接管、一‘一’一‘一‘”----一__、二、。二瓜、,二二一;’二一:三几_:三二一二二几二丫二介.1、’(仰正国)安设顶进设备和出土等的工作场所。管节卸入工作坑’‘’-一‘后,通过传力顶铁和导向轨道,用支承在基坑后座上的液压千斤顶将管节顶入土层中,同时在管内取土。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条