1) Bi-Au correlation
Bi-Au相关性
2) Au-Ag relativity
Au-Ag相关性
3) Bi element
Bi相
4) Au-Pb-Zn-Bi±Cu mineralization
Au-Pb-Zn-Bi±Cu矿化
5) Bi-2212 phase
Bi-2212相
1.
Dynamics research on Bi-2212 phase to Bi-2223 phase transformation;
Bi-2212相向Bi-2223相转变过程的动力学研究
2.
The selected area electron diffraction(SAED) and the convergent beam electron diffraction(CBED) patterns of the modulation model for the Bi-2212 phase have been simulated.
通过计算机模拟计算了Bi-2212相A型调制结构的选区电子衍射和会聚束电子衍射花样。
3.
The point group of the supercell of the Bi-2212 phase with type A modulation structure is 2mm,its space group is I2mm.
采用会聚束电子衍射(CBED)对Bi-2212相和Bi-2223相中具有非公度调制结构的超胞结构进行了测定。
6) Bi-2223 phase
Bi-2223相
1.
Dynamics research on Bi-2212 phase to Bi-2223 phase transformation;
Bi-2212相向Bi-2223相转变过程的动力学研究
2.
The investigation of microstructures of the Bi-2212 and Bi-2223 phases in Bi high temperature superconductors is very significant for improving technology of production and researching superconducting properties and mechanisms.
采用会聚束电子衍射(CBED)对Bi-2212相和Bi-2223相中具有非公度调制结构的超胞结构进行了测定。
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条