1) Gravity Flow Operation
自流作业
2) flow production
自喷开采;流水作业
3) open-shop
自由作业
1.
On the scheduling problem of two machine open-shop;
关于一类两台机器自由作业的排序问题
2.
Dense Schedules for Open-shop with Job s Release Date;
工件有到达时间的两机器自由作业稠密时间表(英文)
3.
On the Total Flow-Time Problem of Two Machine Open-Shop;
关于二台机器自由作业的总流程问题
4) Open Shop
自由作业
1.
The two machine open shop problem with delays and release times is considered and it is proven that the problem is very NP difficult by making up a workpiece.
研究了具有准备时间和延迟时间的自由作业问题 。
2.
For an open shop problem, if the principle of avoiding unnecessary idleness is applied to arrange available jobs for the schedule construction, a dense schedule is obtained.
对于自由作业问题 ,如果从初始时刻开始 ,逐步在每个机器安排任一可以加工的工件 ,避免不必要的空闲 ,所得的安排称为稠密时间表。
3.
This paper is concerned with the makespan problem of scheduling groups of jobs in two machine open shop.
讨论关于工件组的两机自由作业时间表的加工全长问题。
5) Autonomous Task
自主作业
1.
Research on Autonomous Task Control Technology of Construction Robot with Stereo Vision System;
具有立体视觉的工程机器人自主作业控制技术研究
2.
Research on Autonomous Task Fuzzy Control Technology of Four DOF Construction Robot;
四自由度工程机器人自主作业的模糊控制技术研究
6) Workflow Job
工作流作业
补充资料:兵棋作业(见想定作业)
兵棋作业(见想定作业)
war gaming exercise
bingqi zuoye兵棋作业(war ga而ng exercise)见想定作业。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条